28
Maintenance
Recommended maintenance actions
FIMER recommends that you do these maintenance inspections annually to ensure the
highest reliability and optimum performance of the inverter.
Note:
Perform the recommended maintenance actions listed below more often in
case the inverter is installed out of the specified operational and environmental
conditions. Refer to the
Hardware manual
. Pay special extra attention during the
first year after commissioning.
Recommended maintenance intervals
1) Tighten the main circuit terminals during commissioning. Refer to the recommended tightening torques in
the
Hardware manual
. If the installation conditions require it, check the tightness more often. Obey the local
regulations.
Note:
The recommended maintenance intervals and component replacements
are based on specified operational and environmental conditions. FIMER
recommends annual inspections to ensure the highest reliability and optimum
performance.
Reduced run
The PVS980-58 has two identical power sections, as shown on the
Simplified main circuit
diagram
in the
Hardware manual
. The DC inputs and AC outputs of all of the power
sections are normally operated in parallel.
Using the disconnection devices of the inverter, you can isolate a DC/AC inverter section,
or the DC input cable section, and continue operation with the remaining sections.
Operation with a reduced number of DC/AC inverter sections is called reduced run.
The isolation of DC inputs and reduced run may require the operator to turn manual AC or
DC switches. The contactors and breakers are controlled automatically by the inverter’s
software when reduced run operation is selected from parameters.
Target / task
Action
Connections and the environment
Environment check
I
Spare parts
Spare parts
I
Inspections
Air inlet and outlet grills
I
Inverter overall condition check, dustiness, corrosion, temperature
I
Heat exchanger
I
Component
Years from start-up
1
3
6
9
12 15 18 21 24 25
Main cooling fans
Main channel cooling fans
R
R
R
R
Cooling fan, LCL filter units
R
R
R
R
Cabinet cooling fan
Main cabinet circulation fans
R
R
R
R
Control
Auxiliary power supplies
R
R
Auxiliary power buffer circuit
R
R
Connections and environment
Tightness and cleanliness of AC and DC terminals
1)
I
I
Summary of Contents for PVS980-58
Page 1: ...Central inverter PVS980 58 From 1818 to 2091 kVA Commissioning and maintenance manual...
Page 4: ...2...
Page 14: ...12 Safety instructions...
Page 18: ...16 Introduction to the manual...
Page 28: ...26 Electrical commissioning...
Page 60: ...58 Maintenance...