Start-up and operation
Contents of this chapter
This chapter describes the start-up procedure of the inverter.
Start-up procedure
Do a test of the operation of the inverter first in the local control mode with the control
panel (ACS-AP-I) or the Drive composer PC tool. Then set the control program
parameters.
Tasks
Safety
WARNING!
Obey the safety instructions during the installation and start-up procedure. Refer to
chapter
on page
Only qualified electricians can install and start-up the inverter.
Primary and ambient conditions
Make sure that the mechanical and electrical installation of the inverter is correct. Refer to section
on page
Make sure that the insulation of the assembly is sufficient. Refer to section
.
If the insulation is not sufficient, the optional insulation resistance monitoring cannot be tuned properly.
Make sure that the ambient conditions for start-up, temperature, humidity, altitude etc. are within the
limits. Refer to
PVS800-57B central inverters hardware manual
(3AXD50000048300 [EN]).
Set up the cabinet heater: Set the maximum temperature settings of the thermostats according to the
schematic drawings.
If the inverter is installed in a very humid environment, and there is a delay before commissioning
without auxiliary power, use the cabinet heaters for several days before you do the commissioning.
Summary of Contents for PVS800-57B
Page 1: ...ABB SOLAR INVERTERS PVS800 57B central inverters Commissioning and maintenance manual...
Page 4: ......
Page 8: ...8...
Page 16: ...16 Safety instructions...
Page 22: ...22 Introduction to the manual...
Page 27: ...Storing lifting and transporting 27 Moving the crate with a forklift...
Page 38: ...38 Mechanical installation...
Page 50: ...50 Electrical installation...
Page 56: ...56 Start up and operation...
Page 70: ...70 Maintenance 5 6 4 3...
Page 71: ...Maintenance 71 7 8 8...
Page 72: ...72 Maintenance 9 10...
Page 76: ...76 Maintenance...