Mechanical installation 29
4
Mechanical installation
Contents of this chapter
This chapter describes the mechanical installation of the inverter. Obey all local
regulations.
Safety
Refer to
on page
.
For instructions on how to move the inverter, refer to
Storing, lifting and transporting
page
.
Required tools
The tools required to move the inverter, fasten it to the foundation and tighten the
connections:
•
Crane, fork-lift or pallet truck (with sufficient load capacity), and iron bar, jack and
rollers.
•
Pozidriv and Torx (2.5...6 mm) screwdrivers
•
Torque wrench
•
Set of wrenches and sockets
Unpacking
Before the delivery check and the installation, unpack the inverter from the transportation
and storage package. Be careful to not cause damage to the inverter.
To prevent damage to the inverter, unpack the inverter as late as possible before the
installation.
Summary of Contents for PVS800-57B
Page 1: ...ABB SOLAR INVERTERS PVS800 57B central inverters Commissioning and maintenance manual...
Page 4: ......
Page 8: ...8...
Page 16: ...16 Safety instructions...
Page 22: ...22 Introduction to the manual...
Page 27: ...Storing lifting and transporting 27 Moving the crate with a forklift...
Page 38: ...38 Mechanical installation...
Page 50: ...50 Electrical installation...
Page 56: ...56 Start up and operation...
Page 70: ...70 Maintenance 5 6 4 3...
Page 71: ...Maintenance 71 7 8 8...
Page 72: ...72 Maintenance 9 10...
Page 76: ...76 Maintenance...