Page 102
© Copyright 2021 ABB. All rights reserved.
•
12
-
Position Jumper:
12
-
position jumper arrangement that configures the NES872 operate in a positive of negative
battery plant. The jumper is selected so that all polarity sensitive items are selected at once by configuring one
header. Note: factory ordered systems are generally pre
-
configured and will have the jumpers appropriately set.
The block jumper is arranged as shown.
Connector Definitions
The NE872 module has six connectors used for board power, measurement, alarm inputs and various serial
communications.
Positive DC
Negative DC
12
3
J10
Figure 24 NE872A ID Jump-
FAJ
NC
SHREF
SHUNT+
o
o
OS
NE_CM
on
on
o
on
on
SHUNT
-
J1
J2
LVD_COILA
coil.
LVD_C
LVD_NO
LVD_COILB
BATT_SNS
Contactor.
Summary of Contents for Pulsar Edge
Page 2: ...Page 2 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 6: ...Page 6 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 14: ...Page 14 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 22: ...Page 22 Copyright 2021 ABB All rights reserved Step Action o o hadtobeperformed location ...
Page 34: ...Page 34 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 41: ...Page 41 Copyright 2021 ABB All rights reserved Figure 9 Pulsar Edge Status Menu ...
Page 49: ...Page 49 Copyright 2021 ABB All rights reserved Figure 13 Reports Menu ...
Page 50: ...Page 50 Copyright 2021 ABB All rights reserved Figure 14 Maintenance Menu ...
Page 51: ...Page 51 Copyright 2021 ABB All rights reserved Figure 15 Settings Menu ...
Page 92: ...Page 92 Copyright 2021 ABB All rights reserved o o o o ...
Page 108: ...Page 108 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 116: ...Page 116 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 154: ...Page 154 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 162: ...Page 162 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 192: ...Page 192 Copyright 2021 ABB All rights reserved This page intentionally left blank ...