HVC-R 100/150 E-Bus Charger Installation Guide
Document: v0.4 / Document No.: TBA | Date: 11-08-2021 Page
57
of
131
5.4.1. Moving the Power Cabinet with a hoist
Moving Power Cabinet with a hoist
A Swivel eye bolts (standard delivered with the cabinet)
B Lifting loops
C Hoisting equipment
Prerequisites:
A minimum of two qualified workers are required: one person to operate the hoisting
equipment, the other to guide the Power Cabinet to its location.
Use M16 swivel eye bolts (A) or M16 bolts with lifting loops (B).
1. Insert the bolts (A) or (B) into the holes at the opposite corners of the cabinet, if not placed
upon delivery.
2. Tighten the bolts.
3. Connect the hoisting equipment (C).
CAUTION
Keep the hoisting angle below 60
⁰
.
4. Move the Power Cabinet to the foundation.