HVC-R 100/150 E-Bus Charger Installation Guide
Document: v0.4 / Document No.: TBA | Date: 11-08-2021 Page
38
of
131
B4
Transport
Arrangement for the delivery of the HVC-R 100/150 E-Bus Charger with the ABB
Delivery department - see
Contact information
on Page 12 for contact details. The
delivery time is at least four months.
4.2. Providing foundation for the Power Cabinet
4.2.1. Available options
Use the appropriate foundation for the type of surface that the Power Cabinet will be installed
on:
Soil
Use a concrete foundation to get a firm fixation on soil.
A concrete foundation can be ordered separately. See section
Accessories
on Page
18. For detail drawings see Appendix C
Dimensions of the Power Cabinet’s Concrete
Foundation
.
Solid floor
1. Use a metal frame foundation to guide the cables from the cabinet to the cable
duct. This foundation can be ordered separately. See section
Accessories
on Page
18. For detail drawings see Appendix D
Dimensions of the Power Cabinet’s Metal
Foundation
.
2. The Power Cabinet is installed directly on a solid floor, through which the floor is
accessible from below (related to the feed through of the cables). For detail
drawings see Appendix A
Dimensions of the Power Cabinet
.
The cables must be embedded in the ground within cable conduits. See section
Cable routing
on Page 46 and section
Civil installation
on Page 34.
NOTICE
It is advised to install traction wires into the conduits to install the
electrical cabling afterwards.
NOTICE
Be aware of the bending radius of the AC power input cables when using
the metal frame foundation. This metal frame foundation has a height of
180 mm.