Operation Manual / TPS48-D/E.. - TPS61-D/E..
Disassembly and assembly
8
Disassembling and assembling
turbocharger
8.3
Page 103
Apr
il 2015
H
ZT
L2410_
EN
R
ev
is
ion
D
NOTICE
To ensure the nozzle ring is held in place during operation, it must be
clamped between the partition wall and the turbine casing.
Calculate the press fit (PD) as shown.
NOTICE
If the calculated value (PD) is less than 0.1 mm, an official ABB
Turbocharging Service Station must be contacted.
Measure the axial and radial clearances (see the section Axial and
radial clearances).
Nozzle ring press fit for
single inlet turbine casing
© Copyright 2015 ABB. All rights reserved.