
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
83
11 Appendix
11.1 Measurement record
Overview
Record the final measurements of the draw rod.
Record
Serial number
Date
Operator
G007207
Ø (mm)
1
H (mm)
a (mm)
2
b (mm)
3
c (mm)
X1 (mm)
1
Thread diameter.
2
Draw-rod nut tightened with 10 Nm.
3
After hydraulic tightening.
Comments
Summary of Contents for GOE 2600
Page 12: ...12 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 18: ...18 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 78: ...78 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 82: ...82 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...