Remove the pull-through cord (12).
9.
Remove the bolts (6), the washers (7) and the
lifting tool (1).
G006956
10.
Tighten the draw-rod nut, refer to
Hydraulic tightening of the draw-rod nut,
page
End of instruction
4.4.5 Installation of the bushing with the fixed bottom contact
Overview
This procedure is only applicable for bushings with a fixed bottom contact.
The fixed bottom contact is installed when it is delivered from Hitachi ABB Power Grids.
CAUTION!
Do not remove the fixed bottom contact.
G007609
36 Fixed bottom contact
Summary of Contents for GOE 2600
Page 12: ...12 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 18: ...18 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 78: ...78 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Page 82: ...82 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...