Installation and commissioning guide
2750 515-1 EN, REV. 14, 2020-06-26
55
4.10 Minimum oil-level in transformer
Procedure
1.
Make sure that the transformer oil-level is
maximum 30 mm from the lower side of the
bushing flange.
CAUTION!
A lower oil-level will reduce the
electrical insulation.
G006300
End of instruction
4.11 Installation of the outer terminal
Procedure
1.
Prepare the contact surface (47) and gasket
surface (87):
1.
Carefully clean the contact surface and
gasket surface with a soft cloth.
2.
Apply Vaseline to the contact surface.
3.
Apply Mobilgrease 28 to the gasket surface.
CAUTION!
Do not use a wire brush on the tin/zinc
coating (47).
G000403