background image

TEHI95094 – rev. 1 

4 / 11

 

 

1  Introduction 

This publication contains the information needed to install medium voltage AutoLink 
Sectionalizer and put it into service. 

For a correct use of the product, please read it carefully. 

Like every apparatus we manufacture, AutoLink is designed for different installation 
configurations. 

However, these pieces of apparatus do allow further technical and construction 
modifications (at customer’s request) to adapt to special installation requirements. 

Consequently, the information given here may sometimes not contain instructions 
concerning special configurations. 

Besides this manual, it is therefore always necessary to consult the latest technical 
documentation (assembly and installation drawings, protection coordination studies, etc.), 
specially regarding any variants requested in relation to the standardized configurations. 

Only use original spare parts for maintenance operations. 

For further information, please also see the technical catalogue and the spare parts 
catalogue. 

All installation, putting into service, commissioning and maintenance 
operations must be carried out by suitably qualified personnel with in-
depth knowledge of the apparatus. 

2  Packing and Transportation 

The AutoLink Sectionalizer is shipped in cardboard package, in disarmed position. 

Each piece of apparatus is protected by a plastic cover to prevent any infiltration of water 
during loading and unloading stages, and to keep the dust off during storage. 

3  Checking on Reception 

Before carrying out any operation, always make sure that the operating 
mechanism springs are discharged and that the apparatus is in disarmed 
position. 

On reception, check the state of the apparatus, integrity of the packing and 
correspondence with the nameplate information along with the order confirmation 
specifications and the accompanying shipping note. 

Also make sure that all materials described in the shipping note are included in the 
supply. 

Should any damage or irregularity be noted in the supply on unpacking, notify ABB 
(directly or through the agent or distributor) as soon as possible and in any case within 
five days of receipt. 

The apparatus is only supplied with the accessories specified at the time of ordering and 
validated in the order confirmation sent by ABB. 

Summary of Contents for AutoLink

Page 1: ...TEHI95094 rev 1 AutoLink 15kV 27kV 33kV Mounting Instructions...

Page 2: ...tice and safety in the workplace are constructed Strictly follow the information given in this instruction manual Check that the rated performance of the apparatus is not exceeded during service Check...

Page 3: ...3 Checking on Reception 4 4 Storage 5 5 Description 5 6 Installation 5 6 1 General 5 6 2 Installation and service conditions 5 6 3 Initial Setting or Previous Setting Modification Instructions 6 6 4...

Page 4: ...into service commissioning and maintenance operations must be carried out by suitably qualified personnel with in depth knowledge of the apparatus 2 Packing and Transportation The AutoLink Sectionaliz...

Page 5: ...rom any flammable materials and at a temperature between 5 C and 45 C In any case avoid any accidental impacts or positioning which stresses the structure of the apparatus 5 Description The AutoLink E...

Page 6: ...g Modification Instructions Remove the contact cap Fig 1 A with a 34mm fork spanner holding the base Fig 1 B with the hand Check condition of O ring Fig 2 E and replace if necessary applying grease on...

Page 7: ...nt and counts are selected cover the dipswitch with a generous amount of silicon grease Fig 3 supplied with AutoLink Figure 3 Check the condition of the O Ring Fig 2 E and apply silicon grease Fig 4 F...

Page 8: ...0 Nm without damaging the O Ring Fig 5 Figure 5 6 4 AutoLink Repositioning Push the interlocking bolt Fig 6 until blocked it will spin freely but it will not reset Do not strike the bolt nor use any t...

Page 9: ...until it is firmly blocked Fig 8 Figure 8 Place the pole in the tube inferior eyelet Fig 9 and position in the isolating support body Figure 9 Withdraw the pole and place it in the tube s superior ey...

Page 10: ...regular basis preferably while maintenance on head recloser is made Check the closing system Check that the interlocking bolt turns freely The tensioning device support should move easily and the spr...

Page 11: ...TEHI95094 rev 1 11 11 Copyright 2007 ABB All rights reserved Document Title AutoLink Document No Date Rev Ind No of Pages Page TEHI95094 EN 1 11 11...

Reviews: