Installation checklist of the drive
Contents of this chapter
This chapter contains a checklist of the mechanical and electrical installation of the drive.
Checklist
Examine the mechanical and electrical installation of the drive before start-up. Go through
the checklist together with another person.
WARNING!
Obey the safety instructions of the drive. If you ignore them, injury or death, or
damage to the equipment can occur.
If you are not a qualified electrician, do not do installation or maintenance work.
WARNING!
Stop the drive and do the steps in section
Electrical safety precautions (page 38)
before you start the work.
Make sure that …
The ambient operating conditions (including free space around the drive) meet the specifications.
The drive cabinet has been attached to floor, and if necessary due to vibration etc, also by its top to
the wall or roof.
The cooling air flows freely in and out of the drive.
If the drive is connected to a network other than a symetrically grounded TN-S system: Check the
compatibility. See the electrical installation instructions in the supply unit manual.
There is an adequately sized protective earth (ground) conductor between the drive and the switchboard,
the conductor has been connected to appropriate terminal, and the terminal has been tightened. (Pull
on the conductor to check.) Proper grounding has also been measured according to the regulations.
7
Installation checklist of the drive 55
Summary of Contents for ACS880-0500-3
Page 1: ... ABB INDUSTRIAL DRIVES ACS880 607 3 phase brake units Hardware manual ...
Page 2: ......
Page 4: ......
Page 8: ...8 ...
Page 12: ...12 ...
Page 30: ...30 ...
Page 32: ...32 ...
Page 36: ...36 ...
Page 44: ...44 ...
Page 54: ...54 ...
Page 62: ...62 ...
Page 66: ...66 Maintenance ...
Page 82: ...Dimension drawing bottom exit 82 Dimension drawings ...
Page 83: ...Dimension drawings 83 ...
Page 84: ...Dimension drawing top exit 84 Dimension drawings ...
Page 85: ... Dimension drawings 85 ...
Page 86: ......