![ABB ACH580-34 Quick Installation And Start-Up Manual Download Page 8](http://html.mh-extra.com/html/abb/ach580-34/ach580-34_quick-installation-and-start-up-manual_3045231008.webp)
•
Lift the sleeve.
•
Unpack the top boxes.
•
Insert lifting hooks to the drive and LCL filter module lifting lugs (see section
Step-by-step drawings for an installation example in Rittal VX25 800 mm wide
enclosure (page 293)
) and lift the modules to the installation place.
■
Drive module package
3AXD50000174287_20210204
1
18
15
3
7
5
19
20
17
10
14
21
16
8
11
6
9
2
13
12
4
22
Transport package contents
Finger guard
1
Pedestal guide plate for the LCL filter module
2
Pedestal guide plate for the drive module
3
Accessories box
4
See the box contents on the following pages.
Center of gravity symbol
5
Package for LCL filter fan
6
Package for LCL filter pedestal
7
Telescopic extraction/installation ramp
8
Package for H370: Full-size input power cable connection terminals and PE busbar.
9
Plywood support
10
With B051: Clear plastic shrouds box and output cable connection terminals box.
11
With H370: Also input cable connection terminals box.
8 EN – Quick installation and start-up guide
EN
DA
DE
ES
FI
FR
IT
NL
PL
PT
SV
TR
ZH
Summary of Contents for ACH580-34
Page 2: ......
Page 44: ...44 ...
Page 176: ...176 ...
Page 242: ...242 ...
Page 264: ...264 ...
Page 284: ...284 ...
Page 306: ...306 Step by step drawings for an installation example in Rittal VX25 800 mm wide enclosure ...