6. Push cables through the tight openings in the cable plate, through the gasket
and then strip down the cables.
7.
Strip down the cables to 10 cm and crimp the ferrules on each wire using an
appropriate crimping tool. Leave 2 cm of the cable screen.
8. Locate the green connectors with high-speed channels marked HSChxx. Check
the polycarbonate protecting sheet to identify the channel .
HSCh3 HSCh2 HSCh1 HSCh0
RTN IN
9. The sensor mounting position on the rotating machinery and its connection
inside the DAU are predefined in the ABB Ability™ Smart Sensor mobile
application during commissioning. For more information, see section
Commission the MACHsense-R (page 32)
52 Connecting the cables
Summary of Contents for Ability MACHsense-R
Page 1: ...ABB MOTION SERVICES ABB Ability MACHsense R MSR1608 Data acquisition unit User manual...
Page 2: ......
Page 4: ......
Page 8: ...8...
Page 12: ...12...
Page 18: ...18...
Page 20: ...Process overview diagram 20 Getting started...
Page 26: ...26...
Page 34: ...34...
Page 42: ...42...
Page 46: ...46...
Page 50: ...50...
Page 58: ...58...
Page 66: ...66...