ENG
43
9 Software
9.1 Installation
ETS
(from V.
1.3)
1. Install the panel commissioning software from the current EIB database on a PC.
2. Import the product database into the ETS.
3. Configure the unit and set the parameters.
Power-
Projekt 4.x
1. Install the panel commissioning software from the current EIB database or from the
Power-Projekt CD.
2. Configure the unit and set the parameters (see above).
The EIB database can be purchased directly from ABB or downloaded from the Internet
at www.abb.com.