background image

 

QUICK START GUIDE

 

Page 11

 

 

Version 1.0

 

© 2021 ABB. All rights reserved.

 

 

 

We reserve the right to make technical changes or modify the 
contents of this document without prior notice. With regard 
to  purchase  orders,  the  agreed  particulars  shall  prevail. 

 

ABB  does  not  accept  any  responsibility  whatsoever 

 

for  potential  errors  or  possible  lack  of  information  in  this 
document.

 

We reserve all rights in this document and in the subject matter and 
illustrations contained therein. Any reproduction, disclosure to third 
parties or utilization of its contents –

 

in whole or in parts –

 

is 

 

forbidden without prior written consent of ABB.

 

 

Copyright© 2021 ABB

 

All rights reserved

 

ABB

 

601 Shiloh Rd.

 

Plano, TX USA 

 

 

abbpowerconversion.com

 

Summary of Contents for 2CKT COMBINER 1600389997A

Page 1: ...QUICK START GUIDE Page 1 Version 1 0 2021 ABB All rights reserved Power Express 2 Circuit and 4 Circuit Combiner Quick Start Guide 8600430826P 1600312215A 4CKT COMBINER 1600389997A 2CKT COMBINER ...

Page 2: ... Step 3 Connect DC Input 7 Step 4 Connect DC Output 7 Step 5 Connect DC Output to Ground 8 Step 6 Connect Alarm Cable 8 Information LEDs and Alarms 9 Specifications and Applications 9 Change History excludes grammar clarifications 10 Disclaimer 11 List of Figures Figure 1 Mounting Shelf 6 Figure 2 Chassis Ground Connection 6 Figure 3 DC Input Connection 7 Figure 4 DC Output connection 7 Figure 5 A...

Page 3: ...quipment ratings to assure current does not exceed Continuous Load List 1 60 of protector rating Maximum Load List 2 typically end of discharge 80 of protector rating Field wired Conductors Follow all National Electric Code NEC and local rules and regulations Insulation rating 90 C minimum 105 C minimum if internal to enclosed equipment cabinets Size AC field wired conductors with 75 C ampacity NE...

Page 4: ... When equipped with ringer modules hazardous voltages will be present on the ringer output connectors Use the following precautions in addition to proper job training and safety procedures Use only properly insulated tools Remove all metallic objects key chains glasses rings watches or other jewelry Follow Lock Out Tag Out LOTO procedures customer specified site specific or general as appropriate ...

Page 5: ...QUICK START GUIDE Page 5 Version 1 0 2021 ABB All rights reserved Equipment Identification 4 Circuit Combiner ID Label information 2 Circuit Combiner ID Label information ...

Page 6: ...ormation Tools Required Wire cutters and strippers Philips Screw Driver 0 Cable crimpers Flat Screw Drivers 1 8 and 1 16 Torque wrench 0 40 in lb Sockets 7 16 5 16 Step 2 Connect Chassis Ground 1 Minimum 6 AWG wire is recommended 2 Lug double hole 1 4 on 5 8 centers Lugs not provided 3 Secure lug with screws 10 32 provided 4 Torque to 10 32 screws to 30 in lb 3 4Nm 5 16 socket Some applications ma...

Page 7: ...lat screw driver torque to 4 5 in oz 0 5 Nm 4 Pull wire to verify connection Caution Ensure cables do not come in contact with sharp or rough surfaces that may damage insulation and cause a short circuit Screw Wire Entry DC Inputs NEC Class 2 Step 4 Connect DC Output There are 2 DC terminal Outputs 1 Use appropriately sized output cable for the load being served 2 Strip the output wire 1 2 3 Inser...

Page 8: ...ernally connected to DC Reference Ground CO Ground Step 6 Connect Alarm Cable Remove alarm connector from the chassis Connect alarm wires 1 Strip wire 3 16 2 Insert wire fully into wire entry 3 Tighten screw 4 Pull wire to verify Insert alarm connector into the chassis Warning Shock Hazard and Equipment Damage Equipment and subassembly ports 1 are suitable for connection to intra building or unexp...

Page 9: ...on devices are required on each input where the transient over voltage due to atmospheric discharge and faults in power distribution systems exceeds these levels For example external SPDs are required when the product is used with outdoor overhead wiring Equipment and subassembly ports are suitable for connection to intra building or unexposed wiring or cabling can be connected to shielded intra b...

Page 10: ...QUICK START GUIDE Page 10 Version 1 0 2021 ABB All rights reserved Version Date Description of the change 1 0 01 04 2022 Initial Release Change History excludes grammar clarifications ...

Page 11: ... not accept any responsibility whatsoever for potential errors or possible lack of information in this document We reserve all rights in this document and in the subject matter and illustrations contained therein Any reproduction disclosure to third parties or utilization of its contents in whole or in parts is forbidden without prior written consent of ABB Copyright 2021 ABB All rights reserved A...

Reviews: