background image

Scorpio 1800 Installation Instructions

CLEANING INFORMATION

The Scorpio bath does not require any major maintenance, but you should follow these simple 
instructions. The bath should be wiped down, preferably whilst the bath is draining, with a soft, 
damp cloth.
To retain the surface quality of the bath, clean weekly using bathroom cleaning mousse or washing-up 
liquid. Warm water and soft cloth is recommended. Stubborn stains may require a non-scratch liquid 
cleaner.
Do not use oven cleaners, souring powders or bleach on any of the surfaces. These may spoil 
the appearance of your bath.
Chalk mark deposits from the water or mild scratches may be removed from the bath surface
with a mild cutting fluid such ‘T’ Cut or Brasso. This should be applied to the affected area with
a soft cloth and rubbed vigorously until a satisfactory finish is affected. The shine to the area 
may then be brought back using a wax-based polish.

WARRANTY
This product is warranted as being free from defects during the period of warranty. This does
not cover minor blemishes, etc. Which may be part of normal manufacturing processes.
The warrenty covers manufacturing defects in the products, starting from the date of supply. 
The warrenty is limited to the value of the purchase price paid.
The warrenty is only valid if the product has been used correctly. Where there are any 
mechanical or electrical parts, any damage, misuse or tampering with them will render the
warranty invalid. Any sealed electrical boxes must remain unopened or this will invalidate 
any warranty.

The baths are not covered for any problems that may arise from the installation or site
planning unless
carried out by engineers from Abacus Healthcare.
Any consequence arising from unskilled or incorrect handling of the product is not covered 
by this guarantee.
The following items, when supplied by Abacus Healthcare are guaranteed for a period of 
twelve months from the date of supply for the parts only (labour costs are not covered).
Tap and mixers
Shower hoses, shower heads and shower brackets.
Flexible pipes including waste outlet, hot and cold supply
Hot and cold taps and mixer taps are proprietary fittings and as such carry a standard 
manufacturer’s warranty.
Note: Thermostatic mixing vaves must be adjusted for the appropriate discharge temperature 
by the installer.
These require regular maintenance for which Abacus engineers are available.
Electrical
All electrical components are CE marked to comply with current European Standards.
Electrical items must not replaced with alternative components without the authorisation of 
Abacus Healthcare.
Failure to obtain such authorisation will exempt tha Company from any liabilityto action for 
further failure.

THERE IS NO OTHER WARRANTY EXRESSED OR IMPLIED INCLUDING, BUT NOT LIMITED TO, THOSE
OF MECHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE.
THE FOREGOING WARRANTY IS LIMITED TO THE TIME PERIOD SPECIFIED FROM THE TIME OF
RECEIPT. IN NO EVENT SHALL THE SUPPLIER BE LIABLE FOR ANY SPECIAL, INCIDENTAL, PUNITIVE, 
OR CONSEQUENTIAL DAMAGES 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

Customer Instruction Certificate

Customer Name_______________________________________________

Bath No:_____________________________________________________

Instruction given on the following:

Person Receiveing Instruction:___________________________________

Signed:______________________________

Date:________________________________

Instructed By:_________________________

Signed:______________________________

Date:________________________________

Customer Copy

14

Summary of Contents for Aquanova Scorpio 1800

Page 1: ...ay High Carr Business Park Newcastle under Lyme ST5 7XE Tel 01782 569330 Fax 01782 569349 Sales 0800 454810 www abacushealthcare co uk e mail service abacushealthcare co uk Aquanova Scorpio 1800 Fixed Seat Transfer System Operation www abacushealthcare com 0808 256 4249 ...

Page 2: ...Contents Technical Specification Pre Installation Instructions Installation Instructions Care and Maintenance Customer Instruction Certificates 2 ...

Page 3: ...50Kg Maximum Water Capacity 200 litres Approximate Bath Weight Empty 155Kg Power Supply Mains 230V to be supplied via 30mA RCD Operating Voltage 24V Battery Backup Yes Water Supply Hot Cold water at 1bar minimum 3 1020 1800 100 1617 636 1003 700 800 1000 1453 ...

Page 4: ...e NO SERVICES BURIED within the floor fixing area For clarity there should be no services within the space detailed on Location of Bath End Feet Assembly diagram Service Feeds See Plumbing Diagrams A B Plumbing This can be either wall or floor fed Feeds should be as follows 22mm hot water inlet 22mm cold water inlet 40mm waste outlet 3ltr Sec Plumb according to Plumbing Diagrams Feeds should termi...

Page 5: ......

Page 6: ...3 Amp IP65 rated switched fused spur is required in addition Electrical Connection Earth Bonding A 30mA RCCD or RCBO is required in compliance in accordance with 17th Edition IEE regulations This should be located just outside the bathroom or on the consumer unit covering that area of the building Earth Bonding and Cross Bonding are to be fitted and tested for continuity in accordance with IEE reg...

Page 7: ...ssure difference between hot and cold pipes will have a great effect on the time it takes to fill a bath i e Hot water 1 4 bar and Cold water 2 4 bar Approx 9min to fill with 180 litres Hot water 2 2 bar and Cold water 2 2 bar Approx 5min to fill with 180 litres If in doubt a pressure test should be carried out prior to installation of the bath and if required a booster pump or pressure reducing v...

Page 8: ...lternatively timber joists can be anchor bolted to the concrete sub floor to provide the needed support The finish should come level with the surface floor b If the void is small it is acceptable to drive through with Raw Coach bolts This may require a small section of the surface floor being removed and material such as sheet wood inserted to fill the area 2 This type of void requires the surface...

Page 9: ...ber on the side of the bath c Prepare the floor area and ensure it is flat level and structually sound and there are NO SERVICES BURIED within the floor fixing area Bath Fitting Ensure that the site is ready as per the Pre Installation Requirements detailed in this pack Remove transport wheels and straps if in place Base Plate Fixing THIS SECTION IS CRITICAL See the floor fixing kit for the correc...

Page 10: ...ll occur Adjustment is possible on the bayonet clip if required Inner Panel Fitting Offer the corner inner end panels right and left up to the bath and secure using the M4 x 12mm white plastic topped machine screws supplied Fig a Screw through holes in panels and into the rivnuts positioned in the frame uprights Use the white plastic binding fixings Fig b to secue the inner panels together There w...

Page 11: ...ion it is vital that the bath be connected to a mains supply for at least 24 hours before initial use to ensure the batteries are fully charged Failure to observe this requirement could result in the user not being able to exit the bath in the event of a mains failure FIG 1 Bath must be a minimum of 25mm away from any wall or fixture if more than 25mm add the difference to the 98mm and the 231mm d...

Page 12: ...reset the system Depress both Bath buttons on the handset at the same time 10 long beeps will sound and the system will reset It is worthwhile checking that the handest cord and jack are still firmly located into the control box Bath Judders Usually occurs if the bath has not been fixed to the floor correctly or the bath is not level Bath Noisy Check to ensure there is nothing touching the bath wh...

Page 13: ...tton is released Make sure the bath is in the fully lowered position using the Handset Bath DOWN button Check the pop up waste is in the fully closed position Fill the bath approximately half full with water Check the water temperature is within safe bathing limits 40 43 Raise the bath using the Bath UP button on the handset Empty the water whilst the bath is in the up position as this will help w...

Page 14: ...em will render the warranty invalid Any sealed electrical boxes must remain unopened or this will invalidate any warranty The baths are not covered for any problems that may arise from the installation or site planning unless carried out by engineers from Abacus Healthcare Any consequence arising from unskilled or incorrect handling of the product is not covered by this guarantee The following ite...

Page 15: ...the following Person Receiveing Instruction ___________________________________ Signed ______________________________ Date ________________________________ Instructed By _________________________ Signed ______________________________ Date ________________________________ Customer Copy www abacushealthcare com 0808 256 4249 Operating your Scorpio Bath Safety Warning Caring for your Scorpio Bath Tra...

Page 16: ...n the following Person Receiveing Instruction ___________________________________ Signed ______________________________ Date ________________________________ Instructed By _________________________ Signed ______________________________ Date ________________________________ File Copy www abacushealthcare com 0808 256 4249 Operating your Scorpio Bath Safety Warning Caring for your Scorpio Bath Trans...

Page 17: ......

Page 18: ......

Reviews: