![ABAC GENESIS Series Use And Maintenance Handbook Download Page 68](http://html2.mh-extra.com/html/abac/genesis-series/genesis-series_use-and-maintenance-handbook_3392256068.webp)
P. 66 - Chap. 9 Troubleshooting
G
B
V-F
V-V
Indication
Possible cause
Intervention
X
X
L3 constant ON
DI
indicates:
“
Compression temp
too high - block
”
Oil radiator
dirty
Call
Customer
Service Centre
X
X
Oil
low
Top up or change oil
(see par. 10.5)
X
X
Excessive ambient
or
air
recirculation temperature
Improve air exchange and
check installation requirements
X
X
FD
clogged
Replace
FD
(see. par. 10.6)
X
X
FA
clogged
Replace
FA
(see. par. 10.4)
X
X
L3 constant ON
DI
indicates:
“
Replace air filter
excess hours. - block
”
FA
to be replaced for
scheduled maintenance
Replace
FA
(see. par. 10.4)
X
X
L3 constant ON
DI
indicates:
“
Replace oil filter
excess hours. - block
”
FO
to be replaced for
scheduled maintenance
Replace
FO
(see. par. 10.6)
X
X
L3 constant ON
DI
indicates:
“Replace oil
excess hours. - block
”
Oil
to be replaced for
scheduled maintenance
Replace
oil
(see. par. 10.5)
X
X
L3 constant ON
DI
indicates:
“Replace oil separator
excess hours. - block
”
FD
to be replaced for
scheduled maintenance
Replace
FD
(see. par. 10.6)
X
X
L3 constant ON
DI
indicates:
“Replace dryer filter
excess hours. - block
”
Dryer filters
to be replaced for
scheduled maintenance
Call
Customer
Service Centre
X
L1
ON
L3 constant ON
DI
indicates:
“INVERTER alarm
block”
Inverter
problems
Call
Customer
Service Centre
Problems in the
electrical
connections between
control unit mc
2
and
inverter
Call
Customer
Service Centre
9.7
Oil in the network
V-F
V-V
Indication
Possible cause
Intervention
X
X
FD
problems
Call
Customer
Service Centre
Inefficient
oil recovery
Call
Customer
Service Centre
9.8
Oil in the machine
V-F
V-V
Indication
Possible cause
Intervention
X
X
Leaking fittings
Fasten the
fittings
Safety valve VS
intervention
Call
Customer
Service Centre
X
X
Summary of Contents for GENESIS Series
Page 1: ...GENESIS FORMULA MODULO 5 5 15 kW USE AND MAINTENANCE HANDBOOK GB...
Page 2: ......
Page 82: ...P 80 Chap 12 Diagrams G B 12 Diagrams Hydraulic pneumatic plant diagram 12 1...
Page 85: ...P 83 Chap 12 Diagrams G B Power circuit wiring diagram 5 5 15 kW Machines with air dryer 12 3...
Page 86: ...P 84 Chap 12 Diagrams G B Power circuit wiring diagram 11 kW Machines with inverter 12 4...
Page 89: ...P 87 Chap 12 Diagrams G B Auxiliary circuit wiring diagram 11 kW Machines with inverter 12 7...