S
2M
Connector Module
Installation
69
5.1
Installation
Please note:
The module should only be installed by trained personnel.
DANGER!
The device contains hazardous voltages.
1.
Pull out the mains plug of the OpenCom 130 / 150.
2.
Open the housing cover of the OpenCom 130 / 150.
3.
On the module board, remove the protective covers of the two S
2M
slots (A)
and (B).
Position of the S
2M
slots on the module board
4.
Insert the S
2M
module into the slots, making sure you insert the LED side of the
module into the upper slot (B).
LAN 1
PCM
LAN 2
Activity LED
B
A
S
2M
slots
Summary of Contents for OpenCom 100
Page 1: ...130 OpenCom100 131 150 Mounting and Commissioning User Guide...
Page 10: ...8...
Page 240: ...Index 238 X XML 124...
Page 241: ...Index 239 Notes...
Page 242: ...Index 240 Notes...
Page 243: ......
Page 244: ...www aastra com As of 19 07 2009 Subject to changes...