Installation
BusinessPhone – Dialog 4220 Lite / Dialog 3210
86
Install pullout leaf
1
Remove the protective film from the guiding rails.
2
Attach the guiding rails to the bottom of the phone,
observing the direction of the “cut” corner.
3
Insert the pullout leaf.