33
NO.
Name
Specification
Qty
1
M
ai
n
post
1
2
Vice post
3
3
Beam
1
4
Beam
1
5
Main platform
1
6
Vice platform
1
7
Ramp
2
8
Jacking beam
1
VI.
、
Adjustment
1. After confirm that the circuit, air and oil connections are correct, inject hydraulic
oil in the motor, and the oil volume should not be less than 10L. After connect with air
and power supply,press up button, pay attention to the direction of the motor. Do not
press the up button for a long time during the test. If the motor is reversed and press
Summary of Contents for SXJS4019A
Page 9: ...8 Top view of steel rope general arrangement ...
Page 43: ...10 2 2 Warning mark ...
Page 55: ...22 ...
Page 56: ...23 Chapter 7 Hydraulic System 7 1 Hydraulic pressure principle drawing ...
Page 60: ...29 ...
Page 61: ...30 ...
Page 62: ...31 ...
Page 63: ...32 ...
Page 64: ...33 ...
Page 65: ...34 ...