
9
5.3. How to Connect the Load Cell
1. Disconnect the power cable of the scale (indicator) from the plug.
2. Remove the 4 M3 screws from the load cell
panel on the backside of the indicator, and
open the load cell panel.
3. Loosen the lock of the cable clamp connecting
to the load cell panel, and pass the load cell
cable through. Fit the rubber packing in the
load cell cable.
The applicable diameter of load cell cable
is from
φ3.5
to
φ
9.0mm.
If the diameter of cable is from
φ3.5
to
φ
7.0, replace the cable clamp with
the accessory rubber packing that is
packed with the product.
If the diameter of cable is from
φ7.0
to
φ
9.0, the cable clamp does
not need to be replaced.
4. Refer to
”, and
connect the cable core to the terminal block
of the load cell.
Hold down the white button on each terminal
in the terminal block of the load cell when
connecting or disconnecting the wire.
(Additional tool is not required.)
5. Once the load cell is connected, make sure
that wiring has been done correctly.
6. Fasten the lock of the cable clamp, and secure the load cell cable.
7. Secure and close the load cell panel with the 4 screws.
To maintain water-proof performance, tighten the cable clamp firmly
when connecting the load cell cable. And tighten the bolts on the rear
panel firmly. The recommended torque is 0.4N
・
m (4kgf
・
cm).
Load cell panel
Load cell cable
Lock
Rubber packing
Load cell panel
Cable clamp
Connect or
disconnect
the wire
while pressing
the white button