2.  A membrane has purposefully been molded over the top of the 0.75” inlet port. This must 

remain intact to allow for pressure testing the feed line. Prior to the start-up, this membrane 

must be drilled out with a minimum of a 3/8” drill bit. Care should be taken not to drill too 

deep and damage the plumbing that has been glued into the bottom of the canister. (A drilling 

tool is available for purchase that will automatically center the drill bit and provide a depth 

stop for perfectly drilled holes.)

2.  Install the 1” threaded male adaptor (Figure 7a) and fill the canister with water to gravity test 

the tank and glue joints.

3.  At start-up, the 1” PVC stand-pipe, inside the QuikDekClor canister, should be cut so that it 

extends approximately one inch above the pool’s water level. Once trimmed to the appropriate 

length, push the stand-pipe into the supplied female adapter at the bottom of the canister 

(Figure 7b).

4.  Now the diverter can be installed into the 0.75” inlet port, in the bottom center of the canister 

(Figure 7c).

Figure 6

Figure 7

Water Line

1.00”

(25mm)

a

b

c

Drilling

Tool

Summary of Contents for QuikDekClor

Page 1: ...Copyright 2020 A A Manufacturing All rights reserved Rev 20200108 A A Manufacturing Installation Instructions User Guide...

Page 2: ...Blank Page...

Page 3: ...r body and PVC schedule 40 pipe IMPORTANT The installer must read this manual completely before attempting installation Consult A A Manufacturing with any question regarding this product This guide mu...

Page 4: ...108 Locating the QuikDekClor Position the QuikDekClor using the following image Figure 2 Figure 2 0 75 Socket 17 39 442mm 19 39 493mm 6 96 177mm 8 25 210mm Top of Canister 1 50 38mm 1 74 44mm 2 08 53m...

Page 5: ...ure 4 Water Line 17 00 432mm Top of Bond Beam Figure 3 Water Line 15 00 381mm Top of Bond Beam 2 00 51mm 2 When using travertine or other thin deck material make sure the top of the QuikDekClor canist...

Page 6: ...piece of pipe into the bottom of the canister and once that joint has set dry fit a 90 elbow Figure 5a 2 From the 90 elbow glue an 18 inch length of pipe and cap the end Configure the balance line so...

Page 7: ...timately regulate the amount of chlorine that enters the pool Plumbing the Feed Line 2 Using 0 75 PVC the feed line can be installed by gluing a 1 5 inch long piece of pipe into the center socket on t...

Page 8: ...that will automatically center the drill bit and provide a depth stop for perfectly drilled holes 2 Install the 1 threaded male adaptor Figure 7a and fill the canister with water to gravity test the t...

Page 9: ...manufacturing date of the product will be the sole determination of the purchase date To obtain warranty service please contact the place of purchase A A Manufacturing shall not be responsible for car...

Page 10: ...chase or register your product online at www amfg com Please Mail to ATTN WARRANTY DEPT A A Manufacturing 3750 W Indian School Dr Phoenix AZ 85019 PLEASE PRINT CLEARLY Owner Information First Name Las...

Reviews: