A&A Manufacturing QuikDekClor Installation Instructions & User Manual Download Page 7

© Copyright 2020 A&A Manufacturing. All rights reserved.

Page 7

Rev. 20200108

1.  After the filter on the circulation return line, plumb a the main-line that will provide the supply 

water to feed line for the QuikDekClor. Use a gate-valve just below the Tee in the header 

(Figure 6). This valve will regulate the amount of water flow through the QuikDekClor and 

ultimately regulate the amount of chlorine that enters the pool.

Plumbing the Feed Line

2.  Using 0.75” PVC the feed line can be installed by gluing a 1.5 inch long piece of pipe into the 

center socket on the bottom of the canister and once that joint has set, dry-fit a 90° elbow. 

3.  From the 90° elbow, glue an 18 inch length of pipe and cap the end. Configure the feed line so 

that pipe lines up with the main-line coming from the 0.75” gate-valve. Now glue the dry-fit 

90° elbow in place (Figure 7).

Figure 6

Water

Feed Line

Figure 7

Dry-fit

Connect to

Water Feed Line

Summary of Contents for QuikDekClor

Page 1: ...Copyright 2020 A A Manufacturing All rights reserved Rev 20200108 A A Manufacturing Installation Instructions User Guide...

Page 2: ...Blank Page...

Page 3: ...r body and PVC schedule 40 pipe IMPORTANT The installer must read this manual completely before attempting installation Consult A A Manufacturing with any question regarding this product This guide mu...

Page 4: ...108 Locating the QuikDekClor Position the QuikDekClor using the following image Figure 2 Figure 2 0 75 Socket 17 39 442mm 19 39 493mm 6 96 177mm 8 25 210mm Top of Canister 1 50 38mm 1 74 44mm 2 08 53m...

Page 5: ...ure 4 Water Line 17 00 432mm Top of Bond Beam Figure 3 Water Line 15 00 381mm Top of Bond Beam 2 00 51mm 2 When using travertine or other thin deck material make sure the top of the QuikDekClor canist...

Page 6: ...piece of pipe into the bottom of the canister and once that joint has set dry fit a 90 elbow Figure 5a 2 From the 90 elbow glue an 18 inch length of pipe and cap the end Configure the balance line so...

Page 7: ...timately regulate the amount of chlorine that enters the pool Plumbing the Feed Line 2 Using 0 75 PVC the feed line can be installed by gluing a 1 5 inch long piece of pipe into the center socket on t...

Page 8: ...that will automatically center the drill bit and provide a depth stop for perfectly drilled holes 2 Install the 1 threaded male adaptor Figure 7a and fill the canister with water to gravity test the t...

Page 9: ...manufacturing date of the product will be the sole determination of the purchase date To obtain warranty service please contact the place of purchase A A Manufacturing shall not be responsible for car...

Page 10: ...chase or register your product online at www amfg com Please Mail to ATTN WARRANTY DEPT A A Manufacturing 3750 W Indian School Dr Phoenix AZ 85019 PLEASE PRINT CLEARLY Owner Information First Name Las...

Reviews: