![A&A Manufacturing QuikDekClor Installation Instructions & User Manual Download Page 7](http://html1.mh-extra.com/html/aanda-manufacturing/quikdekclor/quikdekclor_installation-instructions-and-user-manual_3067838007.webp)
© Copyright 2020 A&A Manufacturing. All rights reserved.
Page 7
Rev. 20200108
1. After the filter on the circulation return line, plumb a the main-line that will provide the supply
water to feed line for the QuikDekClor. Use a gate-valve just below the Tee in the header
(Figure 6). This valve will regulate the amount of water flow through the QuikDekClor and
ultimately regulate the amount of chlorine that enters the pool.
Plumbing the Feed Line
2. Using 0.75” PVC the feed line can be installed by gluing a 1.5 inch long piece of pipe into the
center socket on the bottom of the canister and once that joint has set, dry-fit a 90° elbow.
3. From the 90° elbow, glue an 18 inch length of pipe and cap the end. Configure the feed line so
that pipe lines up with the main-line coming from the 0.75” gate-valve. Now glue the dry-fit
90° elbow in place (Figure 7).
Figure 6
Water
Feed Line
Figure 7
Dry-fit
Connect to
Water Feed Line
Summary of Contents for QuikDekClor
Page 2: ...Blank Page...