9
Electrical
• Test the GFCI breaker protecting the spa for proper operation.
• Disconnect power to the spa.
• Connect the Aquatic 2 cord to the mating connector(s) on the spa control box as
described in the spa’s installation manual and the provided A2Z Ozone wiring diagram in
Figure 2.
• Where possible, route the power cord away from other electrical lines. Do not run the
power cord parallel to any low voltage signal wires.
• Secure the power cord as required to prevent damage.
Operation
• With the spa filled to the proper level, run the spa controller through several cycles.
• Verify that the ozone generator turns on and off as required by the controller.
• The red LED light will be visible from the viewing window on the bottom left.
• Verify that the gas is flowing into the injector.
• There should be no water in the tubing and very small bubbles entering the spa
through the return.
• Verify that water does not push past the check valve during any spa cycle.
• Check for and correct any leaks.
Installation Complete
• Once properly installed, the ozone generator requires no further user operation.
• It will operate automatically with the spa system.