10.4
Solar collector maintenance
See installation or users' manual for the solar collector. If this topic is not covered in the
manual, then contact the supplier of the collectors.
10.5
Finalization
To finalize the maintenance, carry out the following steps:
Fill the water heater (see section 7.9.1).
Start the water heater (see section 4.1).
Check the CO
Check the switching pressure of the pressure switch (see section 7.9.5).
Erase the message SERVICE REQUIRED. The displayed message can be reset in
either of two ways:
Temporary reset: To postpone the message, press once. The message will
reappear on the display 7 days later.
Full reset: To fully reset the message, press and hold both and at the same
time for 5 sec.
On completion of the full reset of the message, the message below will appear on the
display. This message will NOT be shown after a temporary reset of the message.
1.
2.
3.
4.
5.
-
-
94
Installation, Maintenance and Service part
Summary of Contents for SGS-28
Page 6: ...6 ...
Page 13: ...User part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 13 ...
Page 14: ...14 ...
Page 16: ...16 User part ...
Page 18: ...18 User part ...
Page 24: ...24 User part ...
Page 40: ...40 User part ...
Page 41: ...Installation Maintenance and Service part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 41 ...
Page 42: ...42 User part ...
Page 82: ...82 Installation Maintenance and Service part ...
Page 90: ...90 Installation Maintenance and Service part ...
Page 104: ...104 Installation Maintenance and Service part ...
Page 110: ...Fig Dimensions SGS 28 30 50 60 110 Installation Maintenance and Service part ...
Page 112: ...Fig Dimensions SGS 80 100 120 112 Installation Maintenance and Service part ...
Page 121: ...12 8 Declaration of conformity 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 121 ...
Page 124: ...124 Installation Maintenance and Service part ...
Page 126: ...126 Installation Maintenance and Service part ...