8.9.5
Turn on the water heater
Refer to the procedure in the user part to Turn on the water heater (see section 4.2).
8.10
Decommisioning
To decommission the water heater:
Turn off the water heater (see section 8.10.1)
Drain the water heater (see section 8.10.2)
8.10.1
Turn off the water heater
Refer to the procedure in the user part to Turn off the water heater (see section 4.3) and
isolate the water heater from the mains power supply.
8.10.2
Draining
Refer to the installation diagram (see section 8.3) when you drain the water heater:
Close the manual gas valve (10).
If applicable, close the service stop valve (11) in the hot water pipe.
Close the stop valve (10).
Open the drain valve (9).
Aerate the entire installation of air until the water heater is completely drained.
1.
2.
1.
2.
3.
4.
5.
56
Installation, Maintenance and Service part
Summary of Contents for Innovo 12-160
Page 6: ...6...
Page 13: ...User part 0312266_INNOVO_UKUK_V3 0 2017 02 10 13...
Page 14: ...14...
Page 16: ...16 User part...
Page 18: ...18 User part...
Page 24: ...24 User part...
Page 27: ...Installation Maintenance and Service part 0312266_INNOVO_UKUK_V3 0 2017 02 10 27...
Page 28: ...28 User part...
Page 36: ...36 Installation Maintenance and Service part...
Page 43: ...Fig Venting systems 0312266_INNOVO_UKUK_V3 0 2017 02 10 43...
Page 58: ...58 Installation Maintenance and Service part...
Page 70: ...70 Installation Maintenance and Service part...
Page 83: ...0312266_INNOVO_UKUK_V3 0 2017 02 10 83...
Page 87: ...13 5 Declaration of conformity 0312266_INNOVO_UKUK_V3 0 2017 02 10 87...