12
MEDIUM TEMPERATURE - FOUR HEATERS HORIZONTAL STORAGE TANK
MEDIUM TEMPERATURE - FOUR HEATERS VERTICAL STORAGE TANK
CAUTION: IF BUILDING COLD WATER
SUPPLY HAS A BACK-FLOW
PREVENTER, CHECK VALVE OR WATER
METER WITH CHECK VALVE,
PROVISIONS FOR THERMAL
EXPANSION OF WATER IN THE HOT
WATER SYSTEM MUST BE PROVIDED.
* PIPE RELIEF VALVE TO OPEN DRAIN.
† TANK TEMPERATURE CONTROL SET
AT DESIRED TEMPERATURE (MAX. 170°).
HEATER THERMOSTAT SET AT LEAST 5°
HIGHER.
INSTALL IN ACCORDANCE WITH ALL
LOCAL CODES.
NOTE:
BRANCH PIPING TO ALL HEATERS
MUST BE SAME SIZE AND LENGTH FOR
EQUAL FLOW. THESE BRANCHES MAY
BE SIZED UP TO 1 1/4” SO THAT CROSS
SECTIONAL AREAS OF ALL INLETS AND
OUTLETS AT LEAST EQUAL AREA OF
THEIR RESPECTIVE MAIN PIPING.
REVERSE RETURN PIPING SHOWN.
DANGER
:
TEMPERATURE SETTING SHOULD NOT
EXCEED SAFE USE TEMPERATURE AT
FIXTURES. SEE WATER TEMPERATURE
CONTROL WARNING ON PAGES 17 & 18. IF
HIGHER PREHEAT TEMPERATURES ARE
NECESSARY TO OBTAIN ADEQUATE
BOOSTER OUTPUT, ADD AN ANTI-SCALD
VALVE FOR HOT WATER SUPPLIED TO
FIXTURES.
.
Summary of Contents for DSE-120-24
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 10: ......
Page 12: ......
Page 14: ......
Page 16: ......
Page 30: ...15 SMALLCOMMERCIALWIREDIAGRAM 208 240V 3PH SMALLCOMMERCIALWIREDIAGRAM 208 240V 3 1PH...
Page 32: ...17 SMALLCOMMERCIALWIREDIAGRAM SINGLEPHASE SMALLCOMMERCIALWIREDIAGRAM 300 600V 3PH...
Page 40: ......
Page 41: ...SECTION 2 REPLACEMENT PARTS GUIDE...
Page 42: ......