Operating and Assembly Instructions – A.B.S. Flexilo ECO for wood pellets
Assembly
Subject to technical change
Issue 09/2016
Page 24 of 32
©A.B.S. Silo- und Förderanlagen GmbH
Attaching the filling set
5.7 Assembling the extraction devices
Finally, you must attach the extraction system supplied with the silo (suction box, screw box,
spiral conveying system or locking gate valve).
When the silo is filled the removal system should have a ground clearance of 1 to 5 cm.
During the filling process the removal system lifts additionally, since the walls of the silo bag
will get pushed to the side.
The extraction unit should show in the direction of the boiler. This is especially important with
rigid augers
You must pull the filler neck in the silo cover over the filling pipe as far as possible
in order to keep the pellets from striking the seam during filling.
Different extraction systems are available for the Flexilo ECO for wood pellets for
different types of boilers. The assembly procedure for the components may vary
slightly. Nevertheless, the above instructions should always be followed.