background image

www.4iQ.com.pl

Safety advise

Please follow these rules to ensure safe and effective installation.
•  It is best to install the foil tunnel on a sunny and windless day, temper

-

ature above 10 degrees. This makes the foil more flexible and easier to 

arrange.

•  Prepare and clear the area for the greenhouse tunnel. The area should 

be flat. The manufacturer does not recommend setting the tunnel on 
sloping surfaces.

•  Prepare tools that may be useful.
•  Use gloves, some items in the kit have sharp edges.
•  As a friend to help you. Two people are required especially when set

-

ting up the frame and applying the cover.

Required tools (not included):

To assemble the foil tunnel you will need several tools usually available 
in every household:
•  Spade  (for  backfilling  the  collar,  the  collar  can 

also be covered with stones, bricks, etc.)

•  Hammer
•  Spirit level

Set contains:

•  Allen key
•  Nut wrench
•  The frame structure which is numbered according to the drawing
•  A set of bolts, nuts and nut caps
•  Tube covers
•  Tunnel coverage
•  Cable for anchoring
•  Anchor

Step by step instructions:

1.   Open the packaging, check the completeness of the set and read 

the instructions.

2.   Lay out the elements on a flat surface by numbering.
3.   Then lay the tubes according to the diagram. Start assembly from 

the base / frame. Start from the corners of the frame. 

4.   Connect  the  tubes  together  in  accordance  with  the  numbering. 

Please remember that 2 people are required for this job. Arcing re

-

quires assistance. Construction parts may bent if it falls.  

5.   Please note that the strut pipe which is mounted at an angle of 45 

degrees  must  be  between  the  round  pipes  (not  on  the  outside). 
This minimizes the risk of damage to the foil cover.

6.   Make a trench around the greenhouse for the width of the collar. 

Depending on whether we will bury it in soli or put weight on it.  
The excavation depth should not be greater than 10 cm.

7.   Before applying the foil, make sure that the structure is standing 

straight, the screws tightened and mounted with the nuts inwards! 
,so as not to damage the covering. After checking the tightness of 
the nuts, put on the protective caps. They protect the screw itself 
but also eliminate the sharp edges inside the tunnel. WARNING! We 

do not tighten the screws so that this causes a change in the cross-

section of the tube. Over tightening can damage the structure!

8.   Apply the foil to the frame keeping the same length of the tunnel 

on each side and fasten with Velcro to the structure.

9.   When putting the foil on, it is necessary to use the help of another 

person.  Apply  the  foil  slowly  without  using  force  to  avoid  dama

-

ging it. The foil should be attached with the unzipped zippers. The 
foil size is fitted to the tunnel, but they have delicate looseness. This 
is due to the fact that during use, under the influence of temperatu

-

re and sun, foil gently shrinks. This is a natural process.

10.  Check the zipper operation. It should work lightly.
11.  The tunnel prepared in this way is placed in the designated place 

and the collar is buried or secured with weights.

12.  Then anchor the tunnel using the cables provided in the set. An

-

choring is not necessary. This is an additional option.

Notes to the instructions for greenhouse tunnels

•  The greenhouse must be adapted to the weather conditions in the 

place and properly anchored in the ground. The included tension ca

-

bles and pins only provide additional support.

•  Remove the cover for winter. Make sure the cover is clean and dry be

-

fore removing. Fold it gently without breaking the edges when fol

-

ding.

•  Provide additional reinforcements on your own against extreme we

-

ather conditions. It can be secured by additional pins, posts attached 

to the arches or additional cords.

•  Do not leave the tunnel open in strong winds.
•  Do not attach the strings supporting the plants to the construction, 

because it may cause the damage of the tunnel.

•  Do not set up in an open space, set up in a place sheltered from the 

wind.

•  The manufacturer is not responsible for improper use, improper in

-

stallation or damage caused by extreme weather conditions. When 
strong winds are announced, the foil must be removed from the fra

-

me.

•  Cover the collar with soil / sand / stones.
•  The structure should be level before applying the foil.
•  After applying the foil, the zips should close freely.
•  Stretch the foil only after about 20 minutes as the foil heats up.
•  Minor damage to the foil can be repaired with repair tape (not inclu

-

ded), preferably on both sides of the cover. The manufacturer is not 
responsible for mechanical damage.

•  During heavy rain, hollows filled with water may appear on the roof. 

After rain always make sure that there is no water left on the roof.

Keep this manual for future reference

EN

Summary of Contents for 330851

Page 1: ...KA K MONTÁŽI PL SK EN LT CZ PL Zachowaj instrukcję do późniejszego użycia EN Keep the manual for future reference CZ Manuál uchovávejte pro budoucí použití SK Návod uschovajte pre budúce použitie LT Išsaugokite montavimo instrukciją ateičiai 4iQ Group sp zo o ul Ostródzka 54 14 200 Iława Poland 48 89 648 60 85 kontakt 4iQ com pl www 4iQ com pl 2 m 2 m 3m 2x3x2 m ...

Page 2: ...www 4iQ com pl 1 8x 2 4x 3 8x 4 5x 5 10x 6 2x 7 2x 8 2x 9 2x 20x 10x 4x 4x 1x ...

Page 3: ...ęcanie może powodować uszkodzenie konstrukcji 8 Nałożyć folię na stelaż zachowując jednakową długość tunelu z każ dej strony i przypiąć za pomocą rzepów do konstrukcji 9 Zakładając folię konieczne jest skorzystanie z pomocy 2 osoby Fo lię nakładamy powoli nie używając siły aby jej nie uszkodzić Folię należy zakładać z rozpiętymi suwakami Folia jest dopasowana do tunelu posiada jednak delikatne luz...

Page 4: ...s a change in the cross section of the tube Over tightening can damage the structure 8 Apply the foil to the frame keeping the same length of the tunnel on each side and fasten with Velcro to the structure 9 When putting the foil on it is necessary to use the help of another person Apply the foil slowly without using force to avoid dama ging it The foil should be attached with the unzipped zippers...

Page 5: ...í ostré hrany uvnitř tune lu UPOZORNĚNÍ Šrouby neutahujeme tak aby to způsobilo změ nu průřezu trubice Nadměrné utažení může poškodit konstrukci 8 Nasaďte fólii na rám konstrukce tak aby tunel byl na každé straně stejně dlouhý a připevněte suchým zipem ke konstrukci 9 Při nasazování fólie je nutné minimálně 2 osob Fólii nasazujeme pomalu bez použití síly abychom ji nepoškodili Fólie by měla být př...

Page 6: ...ORNENIE Skrutky neutahuje tak aby to spôsobilo zmenu prierezu trubice Nadmerné utiahnutie môže poškodiť kon štrukciu 8 Nasaďte fóliu na rám konštrukcie tak aby tunel bol na každej strane rovnako dlhý a pripevnite suchým zipsom ku konštrukcii 9 Pri nasadzovaní fólia je nutné minimálne 2 osôb Fóliu nasadzujeme pomaly bez použitia sily aby sme ju nepoškodili Fólia by mala byť pripevnená rozopnutím ja...

Page 7: ...Per didelis priveržimas gali sugadinti konstrukciją 8 Uždėkite foliją ant rėmo išlaikydami vienodą tunelio ilgį iš abiejų pusių ir pritvirtinkite velcro prie konstrukcijos 9 Uždėjus foliją būtina pasitelkti 2 žmonių pagalbą Foliją dedame lėtai nenaudodami jėgos kad nepažeistume Folija turi būti pritvir tinta kol slankikliai nėra nuspausti Folija yra pritvirtinta prie tune lio tačiau jos turi nedid...

Page 8: ...www 4iQ com pl 1 3 5 2 4 6 ...

Reviews: