33
70-2011-5643-0 Issue Date: 10/2015
3M
™
Steri-Vac
™
Sterilizer/Aerator GS Series
Site Planning and Installation Guide
Stop and Hook Adjustment
Reference Figure 24.
• The purpose of the STOP is to keep the STACKING RACK/STAINLESS STEEL PANELS from
damaging the flange on the DOOR FRAME when returning the unit to the access area after service
and maintenance.
• Remove the STOP from the right FLOOR CHANNEL. Apply a liberal coating of petroleum jelly to both
the bottom of the STOP and the floor area beneath the STOP.
• Reattach the STOP loosely to the FLOOR CHANNEL, this time in its forward-most position.
• Gently roll the unit back into the access area until contact is barely made between the STAINLESS
STEEL PANELS and the flange on the DOOR FRAME.
• Carefully roll the unit forward, again, and tighten the STOP. Be careful not to move the unit forward
or rearward during this process.
• The purpose of the HOOK is to keep the unit from rolling forward as operators open and close
Sterilizer/Aerator doors.
• Attach the HOOK on the bracket on the lower left comer of the STACKING RACK. Attach the shoulder
bolt and three washers on the outside of the left FLOOR CHANNEL (Figure 20).
• With the unit tight against the STOP, adjust the HOOK so that firm contact is made between the
HOOK and SHOULDER BOLT (Figure 24).
• Tighten the nut on the shaft of the HOOK to maintain the HOOK position.
Flexible Connections
• Connect all electro-mechanical services to the 3M
™
Steri-Vac
™
Sterilizer/Aerator GS Series
(e.g. compressed air, vent line, exhaust hood and electrical).
• Observe all flexible connections while rolling the unit back into the access area. Make sure
that none of these lines fall down into the FLOOR CHANNELS where they might become damaged
by the wheels on the STACKING RACK.
Installing the Louvered Panel
Reference Figure 30.
• Roll the unit back into the access area and secure the HOOK.
• Remove the EXTENSION TRACKS and store them beneath the unit.
• Attach the LOUVERED PANEL.
• Installation is now complete.