Cross-Connect Cabinet Installation
6.1 Install feeder and distribution cables. Provide cable length:
a)
4220 D/DD, E/EE, - 12' above pad
b)
4220 ET/EET - 14' above pad
c)
4220/4230 F/G, MF/M - 16' above pad
d)
4220/4230 KF/K/KT - 18' above pad
e)
4230 LF/L - 22' above pad
6.2 Position cabinet on mounting pad.
a)
Single-sided cabinet, loosen the screws and
remove back panel.
b)
Double-sided cabinet, open rear doors and
remove frames, if factory installed.
Note: Remove all frames to minimize weight.
c)
Remove top and front access panels, front cable
port plate, and lower frame support.
Note: If a lift boom truck is used, reposition the two side
lifting straps for attachment of a sling. Attach lift device
(sling) to cabinet lift straps.
d)
Position cabinet onto the mounting points of the
ring or anchors. Align cables with cable ports.
6.3
Secure cabinet to the pad.
The cabinets have two sets of mounting holes,
external and internal. Refer to your company
practice for which one to use.
a)
External mounting
uses the mounting lugs
provided with the cabinet. Mounting lugs, 1/2"
bolts, and shims are in the parts bag included
with the cabinet.
shim
mounting lug