1 Display: Display of operating parameters, time parameters and operating status.
2) SET CLOCK: Switch to setting state, setting of time parameters, brine quantity parameters.
Saving of settings and exit setting process.
3) NEXT: Confirm setting. Switch to the next parameter setting.
4) / : Selection (increase or decrease) of setting value
5) REGEN: Regeneration at a scheduled time / Hold button for 5 seconds for immediate
regeneration / Returning to previous screen during the setting process
6) To Lock / Unlock Display Screen: Press the buttons in the following sequence: → NEXT →
→SET CLOCK
4.2) Installation and Commissioning Parameter Setting
4.2.1) A self- test procedure will be performed after the controller is connected to the power supply. It
is normal if sound of motor rotation could be heard.
4.2.2) After the self-test procedure is completed, press NEXT and simultaneously for 3 seconds to
enter the installation and commissioning parameter interface.
3.5 Power Connection
Insert the supplied 220-volt power adapter into the power outlet.
SET
NEXT
Down
Regeneration
and cleaning
Display Screen
SET
CLOCK
SET
HARDNESS
NEXT
REGEN
4.1 Controller Panel Overview
Step 1: Setting Local Water Hardness
Set the water hardness in milligrams per
liter of calcium carbonate hardness using
the or . Default value is 340. Value
should range between 1-2500. To proceed
to Step 2, press NEXT. To exit setting
mode, press REGEN.
Note:Any usage of water during
regeneration process will affects
the regeneration effectiveness.
Hence, it is advisable to set
regeneration at time like 2:00am.