Equipment Installation
CAUTION
CAUTION
To reduce the risk associated with property damage due to water leakage:
•
Read, understand, and follow all safety information contained on pages 1-2 prior to installation and use of this product.
IMPORTANT NOTES
IMPORTANT NOTES
• Failure to follow instructions will void warranty.
• Allow a minimum of 3” (7.6 cm) clear space under fi lter to facilitate cartridge change.
• Install with the inlet and outlet ports as labeled. Make sure not to reverse connections.
DF manifold systems may be used with metal or non-metallic piping systems.
1. Shut off incoming cold water supply.
2. Select the installation location. Allow a minimum of 3 in (7.6 cm) of space below the cartridge for change-outs.
3. Select fasteners (not included) and tools appropriate for the installation location (wall, support structure mounted to wall studs, concrete,
etc.)
4. Mount the manifold/fi lter system to a wall or using the mounting holes provided on the back plate of the metal bracket.
• It is recommended to fi rst draw a level line on the mounting surface at the height of the fasteners.
• Mark the location of the fasteners using the bracket as a template or by measuring the distance between the mounting holes.
• Install the fasteners and allow 1/4”-3/8” (6-10 mm) of each fastener to protrude from the surface.
• Install the manifold onto the fasteners.
• Tighten the fasteners.
5. Install ¾” NPT male inlet fi ttings for the ice water inlet and the beverage/coffee water inlet (left and right rear respectively). Install a ½”
Barb fi tting for the ice water outlet, a ½” Barb fi tting for the beverage water outlet, and a ¾” NPT female fi tting for the coffee water
outlet (left, middle and right front respectively). The inlet Connection Kit (CCP# 125830) includes the ½” Barb fi ttings and the two inlet
ball valves. The three system outlets include the fi ttings only. The instructions for the retention clips are on page 4. (PTFE tape is not
included).
6. Remove the sanitary cap from the HF60-S-SR5 cartridge (cartridge with yellow label) and apply a light coat of water or food-grade
lubricant to the o-rings.
7. Align the tabs on the HF60-S-SR5 cartridge with the slots in the retaining plate of the head on the left hand manifold head (NOTE: Head
has yellow 3M label adhered to it). Insert the cartridge into the head and turn the cartridge to the right until a click sound is heard; the click
indicates that the cartridge is properly engaged.
8. Repeat Steps 6 & 7 for the HF60-CL beverage cartridges into the two heads on the right side of the manifold. NOTE: The HF60-CL
cartridges need to be installed into the heads with the blue 3M labels adhered to them.
Equipment Start-up Procedure
1. Turn on incoming water to system.
2. Pressurize system by opening inlet valves for both the ice and cold beverage/coffee water inlets.
3. Check for leaks.
4. Use vent valve to remove trapped air.
5. Flush system in accordance with the cartridge Performance Data Sheet.
5
Summary of Contents for DF260-CL-CC
Page 2: ...NOTES ...