background image

78-0013-1813-4-A 

5

6.0  Running Jumpers 3M

 Quick Connect System 2810 Block

6.1  Open the feeder pair jumper cap by pushing up on 

the latch and rotating up. Insert jumper wire ends 
A (tip) left and B (ring) right into wire openings in 
the cap, making sure they are inserted all the way 
to the back of the cap.

6.2  While holding the jumper wires in place, close the 

cap and press to snap the latch firmly into place.

6.3  Route the jumper wires to the distribution pair 

through wire loops on the block ends and through 
vertical and horizontal wireways. Cut jumper 
wires to appropriate length, leaving at least 5 cm 
(2 in.) of slack.

6.4  Terminate the jumper wires to the distribution pair 

by repeating the procedure described in steps 3.1 
and 3.2.

6.5  Terminate additional jumper wires by repeating 

the above procedure.

6.6  To remove jumper wires, open the cap and pull the 

wires straight out from block.

6.7  Route the wire below the connected cap.

7.0  Installing the Electrical Protectors

Note: Use ONLY UL Recognized or Listed 

protectors in the IBET.

7.1  The 3M

 Indoor Building Entrance Terminal 

(IBET) 4588V-QCS uses a standard five pin 
protector receptacle field. The long pins of the 
protector connect Tip and Ring from the feeder 
cable though the protector to the short pins to the 
distribution/house wire.

7.2  Insert protectors into the protector receptacle field 

according to your company’s practice.

Summary of Contents for 4588V-QCS Series

Page 1: ...Indoor Protected Building Entrance Terminal 4588V QCS Series with 3M Quick Connect System 2811 Dry Flame Retardant Block Instructions Underwriters Laboratories UL 348X Listed April 2010 78 0013 1813 4 A 3 ...

Page 2: ...10 Splicing System SD modules b Splice chamber for the feeder cable with cable strain relief Note diagram c Insulated 6 ground strap for the feeder cable d External bottom mounted three point ground bar and top mounted single point ground bar Note diagram e Numbered standard 5 pin protector receptacle field Note diagram f Binding post log and instruction label g The 3M Single Pair Test Probe and D...

Page 3: ...rt stub insulated ground wire and accessories out of the splicing chamber 2 4 Mount the terminal in designated position with the three mounting screws provided 2 5 Remove the jumper wire retaining ring from poly bag and install in faceplate 3 0 Feeder Cable Preparation and Strain Relief 3 1 Feeder cable diameters for the 3M Indoor Building Entrance Terminal IBET 4588V QCS Series PET Pair Count Fee...

Page 4: ...te Failure to properly bond and ground the terminal per N E C or local equivalent codes may render protection arrestors useless 4 2 Module splicing Splice per your company practice 4 3 Splice the feeder cable groups to the corresponding connectorized stubs according to your company s practice 4 4 3M Scotchlok Connector or individual connector splicing 4 5 Splice the feeder cable groups to the corr...

Page 5: ... least 5 cm 2 in of slack 6 4 Terminate the jumper wires to the distribution pair by repeating the procedure described in steps 3 1 and 3 2 6 5 Terminate additional jumper wires by repeating the above procedure 6 6 To remove jumper wires open the cap and pull the wires straight out from block 6 7 Route the wire below the connected cap 7 0 Installing the Electrical Protectors Note Use ONLY UL Recog...

Page 6: ... cover closed the exposed hasp allows for locking when security is required 9 0 3M Single Pair Test Probe 2827 9 1 Testing using 3M Single Pair Test Probe 2827 9 2 Plug the test probe into the cap of the pair being tested with the black lead to the left and the red lead to the right 10 0 3M Priority Caps 10 1 Priority Caps are used to designate special purpose circuits and prevent entry of the 3M ...

Page 7: ...tack the IBET terminal vertically up to three of the same cable pair count and within the diameter limits in the chart in 3 01 11 2 Mounting the IBET terminal a Mount the IBET terminal bodies using the cable glands to position them b Assemble the feeder cable strain relief according to Section 3 0 and prepare the feeder cable so that 21 of free conductor length will be in the last IBET terminal 1 ...

Page 8: ...8 78 0013 1813 4 A ...

Page 9: ...78 0013 1813 4 A 9 ...

Page 10: ...ranty Limited Remedy Limited Liability This product will be free from defects in material and manufacture for a period of one 1 year from the time of purchase 3M MAKES NO OTHER WARRANTIES INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE If this product is defective within the warranty period stated above your exclusive remedy shall be at 3M s...

Reviews: