
78-0013-1813-4-A
7
10.2 To install Priority Caps, place over the jumper cap
of the pair to be marked and push it into place.
Latching is indicated by an audible snap.
11.0 Multiple 3M
™
Indoor Building Entrance Terminal (IBET) 4588V-QCS
Installation
Note: Use this application when the required
cable pair capacity exceeds the capacity of
a single IBET Terminal.
11.1 The design of the splice chamber and the grooved
cable glands make it possible to stack the IBET
terminal vertically, up to three of the same cable
pair count and within the diameter limits in the
chart in 3.01.
11.2 Mounting the IBET terminal
a)
Mount the IBET terminal bodies using the
cable glands to position them.
b)
Assemble the feeder cable strain relief
according to Section 3.0 and prepare the
feeder cable so that 21" of free conductor
length will be in the last IBET terminal.
1"
minimum
21"
2.75"
minimum
11.3 Place cable glands around the free conductors and
position into the IBET terminal.
11.4 Separate the feeder cable pair assigned to each
IBET terminal; splice and bond the IBET terminal
according to section 4.0.
843017
Summary of Contents for 4588V-QCS Series
Page 8: ...8 78 0013 1813 4 A ...
Page 9: ...78 0013 1813 4 A 9 ...