
4
3.0 Accessories
3.1
Jumper Wire Spools –
4268 - 800 ft. 22 AWG violet/white jumper wire
4368 - 800 ft. 22 AWG red/white jumper wire
4068 - 800 ft. 24 AWG orange/white jumper wire
3.2
4324 Priority Cap for Self-Strip Blocks
3.3
4320 Self-Strip Caps (100 tan & 100
orange)
3.4
4295-SPK Small Port Kit (2-5/8")
3.5
4295-MPK Medium Port Kit (3-3/8")
3.6
4295-LPK Large Port Kit (4")
3.7
PST 4634R (use with 2 5/8" ports)
3.8
PST 4635R (use with 3 3/8" and 4" ports)
3.9
4097-F Flanged Gland Kit (2 5/8" dia.)
3.10 4097-BF Flanged Gland Kit (3 3/8" dia.)
3.11 4075-S or 4077 Series Sealant Boxes
Test Probes
3.12 4327 Self-Strip Single-Pair Probe
3.13 4327-P Self-Strip Pocket Probe
3.14 4328 Self-Strip 25-Pair Test Connector
4.0 Cabinet Mounting
4.1
Attach the Top and Bottom Pole Mount Brackets according to the drawings. The flat slotted edge
of the Bottom Bracket is up. Make sure that the Bottom Bracket is aligned and plumb with the
Top Bracket or it could affect the operation of the doors. Follow your company's "pole mounting
hardware" practice. When required, adjust these dimensions to meet your company practice or
local conditions.
Top and
Bottom
brackets
must be in
alignment
37”
63 1/2”
Ground Line
57 3/4”
15”