05.8 Material Bottle Disposal

Used part material bottles must be disposed of in a manner consistent with local and other applicable laws and regulations governing such
materials. Refer to the VisiJet® materials' MSDS sheets prior to shipment of the ProJet™ Production Modeling System. Discuss your
organization's methods for disposing or recycling of such material with your facilities manager, or for more information, contact 

3D Systems'

.

Customer Support Hotline 

05.9 Weights and Measures

Printer's Weight and Dimensions

Measurements (W x D x H)

CRATED

UNCRATED

183cm x 116cm x 198cm (72" x 45.5" x 78")

152cm x 91cm x 149cm (60" x 36" x 57"- Lid up)
152cm x 95.25 cm x 149cm ( 60" x 37.5" x 57"- Lid down)

Weight

Material Delivery Module (MDM): 14kg (30 lbs.)

CRATED

UNCRATED

With two (2) MDM: 651kg (1435 lbs.)

With two (2) MDM: 481kg (1060 lbs.)

Without two (2) MDM: 624kg (1375 lbs.)

Without two (2) MDM: 454kg (1000 lbs.)

06.0 Operating Enviroment

Locate the ProJet™ Printing System in a convenient location meeting the requirements specified in this document. To ensure optimum
performance, it is important that the printer should be installed in a clean, dry, air-conditioned room. Avoid placing the printer in any environment
with airborne contaminant, including cigarette smoke, fumes, and mechanical particulates that can adversely affect the long term functioning of
this equipment.

Each ProJet™ Production Printing System undergoes an operational test at the factory, and is shipped with a limited,
residual amount of build and support material already in its internal reservoir. When ordering, order enough build and
support materials for each MDMs supplied and for reserves when running production builds. This will ensure adequate
supplies of material are available to avoid build delays.

06.1 Air Conditioning

06.2 Humidity

06.3 Lighting

06.4 Vibration and Shock

06.1 Air Conditioning

A number of the ProJet™ 5000 System's internal electronic components as well as the part material, are sensitive both to ambient temperature
and, to some extent, humidity. In addition, the build process itself can be temperature-sensitive within certain limits. The operating temperature
range should be between 18-28°C (64-82°F); optimally approximately 21-24°C (70-75°F).
The facility air conditioning system where the printer is operating should be capable of dissipating 1.0 kW (3412 Btu or 0.28 ton U.S. refrigeration)
of heat or equivalent to deep temperature requirements. Ensure that any air conditioning ducting does not vent directly onto the machine.

Summary of Contents for ProJet 5000

Page 1: ... 5 3 05 3 Unit Portability 6 1 5 4 05 4 Electrical 7 1 5 5 05 5 Client Workstation Requirements 7 1 5 6 05 6 Network Interface 8 1 5 7 05 7 Material Storage 8 1 5 8 05 8 Material Bottle Disposal 9 1 5 9 05 9 Weights and Measures 9 1 6 06 0 Operating Enviroment 9 1 6 1 06 1 Air Conditioning 9 1 6 2 06 2 Humidity 10 1 6 3 06 3 Lighting 10 1 6 4 06 4 Vibration and Shock 10 1 7 07 0 Preparation for Sh...

Page 2: ...ng 06 4 Vibration and Shock 07 0 Preparation for Shipment Arrival 08 0 MDM Bottle Build Platform Installations 09 0 Limitation of Liability 10 0 Thank You 11 0 Contacting 3D Systems 12 0 Printer Advance Preparation Checklist 01 0 About this Manual This document includes all of the overall facility requirements that will be needed to have a successful installation when our 3D Systems Customer Suppo...

Page 3: ...th bypass engaged is accessible in the vicinity of this sign or behind the access panel Avoid contact Hot surfaces can cause severe A hot surface burns Access panels are for service only and should be opened only by certified service personnel or trained maintenance personnel Indicates that skin or eye irritation could result while exposed to a chemical composition Harmful Irritant Warning When ac...

Page 4: ...ow is a suggested floor plan for a ProJet Production Printing System installation Each printer requires use of a dedicated circuit Multiple printers CAN NOT be located on a single circuit An additional 110 or 220 VAC outlet is recommended for service needs A phone near the printer is recommended to facilitate machine support Each location of the machine requires a standard wall power outlet or pow...

Page 5: ......

Page 6: ... for use on rough or uneven surfaces including deep carpet To avoid the risk of tipping the printer when moving between locations only push from the side of the printer The printer is intended to be lifted from its crate base using a fork lift device and place on casters to roll to its final destination Leveled fork lift pads have been placed beneath the machine to accommodate this need The front ...

Page 7: ...specially in areas where circuits may be affected by an outside source i e lightning required strikes power interruption etc They should have a Some examples of suppliers are Toshiba or APC Power loss during a build will fail the build and minimum rating of 3KVA can cause damage to your printer Uninterruptible power is critical to the successful operation of the machinery 05 5 Client Workstation R...

Page 8: ...k Not all networks have the TCP IP installed Make sure to have a network administrator check that TCP IP are both installed and are running as required PRIOR TO THE ARRIVAL of the printer 05 7 Material Storage VisiJet part and support materials should uie stored in a conveniently located storage cabinet in proximity to the printer itself A cabinet is recommended to protect against long term exposu...

Page 9: ...acing the printer in any environment with airborne contaminant including cigarette smoke fumes and mechanical particulates that can adversely affect the long term functioning of this equipment Each ProJet Production Printing System undergoes an operational test at the factory and is shipped with a limited residual amount of build and support material already in its internal reservoir When ordering...

Page 10: ... qualified 3D Systems Field Service Engineer or an authorized reseller The following topics should be arranged PRIOR TO THE ARRIVAL OF THE SYSTEM to simplify installation of the ProJet Production Printing System Refer to later sections of this guide for details of this procedure Make sure the following resources are available ____ A forklift or similar heavy duty equipment required for unloading t...

Page 11: ...t Before removing bottle from the MDM re tighten bottle cap to prevent spillage To remove bottle open material delivery module and press release latch down and lift bottle out of module Build Platform Ensure that the corner guides on the backside of platform are clean and free of debris If debris exists when installing the platform guides will not lock into the platform elevator NOTE Clean platfor...

Page 12: ...ing System or other products or services 3D Systems strives for higher quality better products and comprehensive services to benefit our customers 11 0 Contacting 3D Systems For information or assistance contact 3D Systems corporate headquarters at 3D Systems Corporation 333 Three D Systems Circle Rock Hill SC 29730 Toll Free Number 800 889 2964 Phone Number 803 326 4080 Web www 3dsystems com Emai...

Page 13: ...________________ Email _____________________________________________________________________ Please place a check in each box once that item is complete Check Box Final installation site selected The intended physical location for each ProJet Production Printing System s should be selected in advance and checked for adherence to the guidelines set out in this guide If required by the shipper a met...

Page 14: ...nter is installed we agree not to alter any requirements without consulting with 3D Systems Customer Service Representative If alteration are made without consulting 3D Systems it may void the system s warranty ___________________________________ _______________ Customer Signature Date Please return a copy of the check list by FAXING it to the appropriate fax number provided in Contacts ...

Reviews: