Installation manual 2N® IP Force
44
/
118
•
•
1.
2.
3.
4.
•
•
Stand, Part No. 9151005
Screws suitable for the surface – are not included in the package
Connect grounding.
Pull the cable
through the stand.
Fit the stand to the
base. Refer to the
Base drilling
template for the
dimensions of the
fitting elements. The
screws are not
included in the
package. Use screws
of your own
according to the
type of surface.
Use a cable bushing
for the
2N
®
IP Force
cable fee-out!
Use of Cable Bushings
The cable bushings included in the
2N
®
IP Force
delivery are designed for the
following cables:
Big bushing: for two cables of the diameter of 5–6 mm (UTP cable), or, upon insert replacement, for one
thick cable/tube of the diameter of up to 14 mm.
Small bushing: for one cable of the diameter of 5–8 mm.
•
Caution
Remember to fit the stand to the base thoroughly especially if there is a risk of vandalism (public
garages, etc.). Steel fitting elements are recommended.
Summary of Contents for IP Force 9151101CHKW
Page 1: ...Installation manual 2N IP Force v 2 18 www 2n com ...
Page 49: ...Installation manual 2N IP Force 49 118 2N IP Force Connectors PCB Version 555v3 ...
Page 50: ...Installation manual 2N IP Force 50 118 2N IP Force Connectors PCB Version 555v4 ...
Page 65: ...Installation manual 2N IP Force 65 118 ...
Page 66: ...Installation manual 2N IP Force 66 118 ...
Page 70: ...Mounting guide ...
Page 72: ...Installation manual 2N IP Force 72 118 ...
Page 73: ...Module setting ...
Page 78: ...Installation manual 2N IP Force 78 118 ...
Page 79: ...Installation manual 2N IP Force 79 118 ...
Page 80: ...Module setting ...
Page 83: ...Active output ...
Page 85: ...Installation manual 2N IP Force 85 118 ...
Page 86: ...Installation manual 2N IP Force 86 118 ...
Page 87: ...Module setting ...
Page 89: ...Security Relay ...
Page 94: ...Installation manual 2N IP Force 94 118 Connection ...
Page 98: ...Installation manual 2N IP Force 98 118 ...