![background image](http://html.mh-extra.com/html/2m-technology/vsc-3000a/vsc-3000a_operating-manual_439729018.webp)
1.
Set up and level the
solar trailer
as described on page 12.
2.
Before raising the tower it is be necessary to install the top devices and adjust them to the required
condition.
WARNING
The trailer must be leveled with the outriggers extended before raising the tower. The outriggers
must remain extended while the tower is up. Failure to level the trailer or extend the outriggers
will severely reduce the stability of the unit and could allow the tower to tip and fall.
3.
Check oil tank, valve blocks, hydraulic cylinder, hoses and oil joints. Make sure there is no leakage and
enough hydraulic oil in the tank.
4.
Check the mast electrical cord for damage.
WARNING
Do not
operate
the unit if the insulation on the electrical cord is cut or worn
through.
Bare wires in contact with the mast or frame may energize the trailer and cause electrocution.
Repair or replace cord.
5
.
Press the extending button on the controller and lift the mast to the required height.
Extend the mast slowly,
making
sure that the electrical cord is extending at the top sections of the mast. If, for any reason, the cable begins to
develop
slack or any of the tower sections get stuck, STOP IMMEDIATELY and contact an authorized service center.
18
RAISING THE TOWER WITH THE OPTIONAL
HYDRAULIC