30 25-Seven Program Delay Manager
Version 2.3 Manual April 2013
TEST”
The GPIO test screen lets you verify that GPIO connections and external remotes
are properly wired.
12345678
Ins: 11111111
Outs:00000000
“‘{} Change CNCL
These change from 0 to 1 while PDM is receiving a trigger on the DB-
25 input (1-8) identified in the line above.
Use
Ò
and
‰
to select an output. Then use
¨
or
Î
to change that
output’s state between 1 (on) and 0 (off).
When you leave the GPIO test screen, the DB-25 outputs are all reset to 0.
Information
Choosing
Information
from the Master menu lets you scroll through screens display-
ing PDM’s current Audio, Network, and Time/Date settings; NTP Status; network MAC
address, and internal temperature. As a general guideline, PDM should run within 20°
Fahrenheit of ambient room temperature
21
. It also provides the unit’s unique software
module number, and the current version numbers of its front panel firmware and sys-
tem software. You’ll need this information if you call 25-Seven for support.
The NTP Status display shows one of three messages, indicating the current connection
with a remote time server:
•
Search
PDM is seeking a path to the remote NTP server. If this message
persists, it may indicate that the NTP server address you entered isn’t valid.
•
Query
PDM has contacted the remote server and calibrating its internal
clock to match. This may take a few minutes depending on the connection
and how much adjustment is required.
•
Sync
PDM’s clock is now synchronized with the remote server’s.
21
There’s more about heat control in the section on Installation, page 50.
Summary of Contents for program delay manager
Page 1: ......