ENGLISH
IT
ALIANO
ESP
ANOL
5
RIGGING
OPERATION
OPERATION
We recommends using the following general guidelines when mounting this product.
• Before deciding on a location for the product, make sure there is easy access to the
product for maintenance and programming purposes.
• Make sure that the structure or surface onto which you are mounting the product
can support the product’s weight (see the Technical Specifications).
• When mounting the product on the floor, make sure that the product and cables are
away from people and vehicles.
Preparing for Operation
• After checking that all the parts are intact and complete, position the machine on
flat. Withdraw the fluid tank from its compartment and remove its cap.
• Verify that the plastic hoses attached to the cap are in place and in good condition
without bending orwarp.
• Always connect the product to a grounded circuit. Before power on, make sure it is
connected with the rated voltage.
• Turn on the machine, and “ Heating up” shows on the display during the heating —
up process.
• After approx. 3 minutes, the display changes to “Ready to work” when the machine
is ready to output.
To access the control panel functions, use the four buttons located underneath the LCD display.
MENU:
Switch menu pages to select a function
TIMER:
Increases the numeric value of current function
Triggers Timer output mode
FOG:
Decreases the numeric value of current function
Triggers Manual output mode.
STOP:
Save settings
STOP turns the fog & bubble output off
Содержание ZZBUBBLE
Страница 1: ...USER MANUAL MANUALE D USO MANUAL DE USUSARIO ZZBUBBLE BUBBLE FOG MACHINE...
Страница 26: ...ITALIANO ESPANOL 26 ENGLISH...
Страница 27: ...ITALIANO ESPANOL 27 ENGLISH...
Страница 28: ...ITALIANO ESPANOL 28 ENGLISH...