- 6 -
Install
:
First Step:
Connect the bottom wire of
meter (17) with the middle wire
of meter(16). Then put the L/R
upright on the frame
assembly(93), lock them with
screw M12*70(120)
,
do not lock
them tightly.
Second Step:
Put the meter assembly (112) on
the upright(3L/R). Connect the
middle wire of the meter
(
16
)
with the up wire of computer
(
15
)
. Use the Screw M8*15
(124) and the Washer(152)
lock tight
Содержание ZX-V8
Страница 1: ...Owner s Manual Of The Motorized Treadmill...
Страница 28: ...27...