TM
FLOOR DRAIN INSTALLATION INSTRUCTIONS
Zurn Industries, LLC
|
Specification Drainage Operation
1801 Pittsburgh Avenue, Erie, PA U.S.A. 16502 · Ph. 855-663-9876, Fax 814-454-7929
In Canada
|
Zurn Industries Limited
3544 Nashua Drive, Mississauga, Ontario L4V 1L2 · Ph. 905-405-8272, Fax 905-405-1292
www.zurn.com
Rev.
C
Date:
02/27/2018
C.N. No.
139680
Form No. FD97
Page
4 of 6
®
10. Remove rough-in cover. See Fig. 10
Note: Do not discard the rough-in cover. Longer screws
and adjustment shims are under the label and may be
needed to adjust for a tilted drain.
For Slab On Grade Installation (Steps 11 and 12)
If finished fixture is tilted, See Step 15
Round
11a. Place a bead of silicone around the circumference of the
last thread of the head assembly. See Fig. 11R
11b. Thread head assembly down until bottom of the frame is
flush with the top of the concrete. See Fig. 11R
11c. Place a bead of silicone around the perimeter of the
strainer frame. See Fig. 11R
12. Turn head assembly clockwise until top of strainer is flush
with the finish floor. Wipe away excess silicone. Remove
protective label once construction is complete. See Fig. 12R
Square
11. Turn head assembly clockwise until top of strainer is flush
with the finish floor. See Fig. 11S
12. Fill in shroud with cement or grout. Ensure to completely fill
in around entire head assembly flush with finished floor.
Remove protective label once construction is complete.
See Fig. 12S
Fig. 10
Fig. 11R
Fig. 12R
Fig. 12S
Fig. 11S