FV38 Rev. D 2/27/12
Page 7
Selection switches
(Shown in Factory
Position for closet
installs)
Selection switches
(Shown in Factory
Position for urinal
installs)
Green
(Flush Signal)
Blue (-)
Brown (+)
Sensor Cover
Reset Button
Rubber Push
Caps
Range
Adjustment
Figure 11
MODEL
A DIM
ZEMS6000
10 1/8
ZEMS6000-2
22 5/8
ZEMS6000-3
25 5/8
Figure 10(Exposed System)
FLUSH VALVE C
L
TOP OF
FIXTURE
Install Vacuum Breaker Flush Connection
Models ZEMS6000, ZEMS6000-2, ZEMS6000-3, ZEMS6001,
and ZEMS6003
Slide the tube nut
(H)
, spud nut
(G)
, slip gasket, rubber gasket
and spud escutcheon over the vacuum breaker tube and
insert tube into fixture spud. Hand tighten tube nut to valve
body and hand tighten spud nut onto fixture spud.
Adjust the
valve assembly for plumb. Tighten fixture spud nut
(G)
, vacuum
breaker tube nut
(H)
and lock nut
(D)
(fig. 7) with a wrench.
Motor Actuator Installation
(Figure 10)
1. Drill 1-3/4" diameter hole per Figure 10.
2. Run “fish tape” from electrical box to 1-3/4" hole.
3. Install actuator escutcheon to the actuator pipe with setscrew toward actuator. Do not tighten setscrew at this time.
4. Pull actuator cable through hole with fish tape and back to sensor box. Secure armored cable to box with box clamp.
5. With escutcheon loose and handle port washer installed, push cable into wall. The actuator must be angled away from the
valve body at this time until the actuator push rod clears the handle port flange. The actuator can now be mounted to the
flush valve and tightened.
6. Push escutcheon back to wall and tighten setscrew.
NOTE:
See Figure 2 for typical installation including optional mini junction box.
H
G
Vacuum
Breaker
Tube Nut
Spud Nut
Slip Gasket
Rubber
Gasket
Spud
Escutcheon
Figure 8
ZEMS6190
ZEMS6195
ZEMS6197
ZEMS6140
ZEMS6142
ZEMS6152
ZEMS6000
ZEMS6000-1
ZEMS6000-2
ZEMS6000-3
ZEMS6001
ZEMS6003
Models ZEMS6140, ZEMS6142, ZEMS6152, ZEMS6190,
ZEMS6195 and ZEMS6197
(Figure 9)
NOTE:
When cutting scored pipe, leave a minimum of 1-1/4"
of scoring to ensure engagement with compression coupling.
Assemble pipe, elbows, couplings, slip washers, rubber
gaskets and flanges as illustrated in Figure 7. Hand tighten
all couplings. Once installation is completed, tighten all
connections.
Figure 9