Zub machine control MK1/100 Скачать руководство пользователя страница 4

 

Connection and Initial Operation 

zub machine control AG 

Manual MK1/100 

 · 

Hardware Installation

 

Seite 4 

MK1/100 

 

For safe operation of the compact motor control 

MK1/100

 it is necessary for the unit to be 

connected and set in operation according to the VDE regulations. 

Follow the steps described below and observe the warning messages. 

How to use the APOS Software, please see software manual, chapter I 'APOS user interface'. 

To supply the 

MK1/100

 compact unit, you require two voltage sources which have the 

following properties: 

power supply 1   

24 V 

±

25 % 

min. output current 3.5 mA 

For the initial tests, you can connect the supply voltages and the end switch to the 

MK1/100

and plug the 9-pin Sub-D jack on the front panel of the 

MK1/100

 into the serial interface of 

the computer. 

 
 

 

 

 

 

 

 

 

 

 

Carry out the test without the motor and the encoder. 

After the voltage turn-on, only the green Power LED should be lit. The red Error LED must 
not be lit. In that case, no error is present. 

In order to carry out the communication test with the computer, select the menu 

Execute

 

 

Error State

 in the APOS program with the 

cursor

 keys

 

 

and

 

 

and the 

Enter 

key. 

A window opens for the messages of the 

MK1/100

. By turning the supply voltage of the 

MK1/100

 off and on, you receive the following initialization message on the monitor: 

Z&B MOC-SDT SN  Zx_xIL1? xxx. 19xx 

Motor controller is initialized with 1 axis 

It should be noted that approx. 5 seconds are required after turn-off before the green Power 
LED is extinguished. 

If you close the window by pressing 

ESC

, an enquiry will appear, asking whether the possible 

failure should be deleted. Answer this with 

J

 (for Yes) and a corresponding command is 

transmitted to the 

MK1/100

. If the command is not received, a time-out error message will be 

displayed. 

If the communication test was not completed successfully, find out about possible causes at 
the end of this section. 

Hardware Installation 

Connection and Initial 

Operation 

! ! !  

Power Supplies and 

Communication Test 

! ! !  

Encoder 

serial interface 

end       machine stop 

PC 

switch 

1  2  3  4 

1  2  3  4  5  6  7  8 

+24 V    GND 

Power  Error 

Содержание MK1/100

Страница 1: ...zub machine control AG 2013 machine control AG MK1 100 Mono axis compact control Manual for installation and hardware reference...

Страница 2: ...stleistung de This manual is set in ITC MixageBQ To improve utilization of the printed manual and the on line help with a variety of programs only special characters from the Symbol and Wingdings font...

Страница 3: ...se of the Encoder and Reference Switch 7 Program testing 7 First steps towards programming 7 Setting the Control Parameters 8 Troubleshooting 9 Hardware Reference 10 Power Supply 10 CPU 10 COM Interfa...

Страница 4: ...case no error is present In order to carry out the communication test with the computer select the menu Execute Error State in the APOS program with the cursor keys and and the Enter key A window ope...

Страница 5: ...essary that the motor shaft is able to move freely The motor must not be connected during this test In order to test the encoder in a simple way at first carry out an APOS test program Select the APOS...

Страница 6: ...be fixed in place and existing brakes are to be released Test the motor with the APOS program MOTORTST M Inform you about File Load and Execute in the section Incremental Encoder After the program has...

Страница 7: ...in the execution window read about the possible causes of the error and the corresponding steps to be taken at the end of this section In order to facilitate initial installation the delivery paramete...

Страница 8: ...e PID filter used is described by the following formula u n KP e n KI e n KD e n e n 1 u n Correction factor in n e n Control error in n n Sample cadence n Sample cadence for differential factor KP Pr...

Страница 9: ...rect interface on the PC with the APOS program Use the original cable or check the cable assignment The encoder does not function Wrong cable assignment Encoder needs higher supply voltage than 5V Che...

Страница 10: ...commands Application program memory 128 kB EEPROM Signal transfer to RS232 standard Baud rate 9600 bit s Data format 8 bit Stop bit 1 Parity none Signals RxD TxD GND Hardware handshake signal none Sof...

Страница 11: ...10800 rpm Input voltage low UEL 0 0 8 V Input voltage highUEH 2 6 V 6 V Input currentIELow 0 mA Input currentIEHigh 2 5 mA 9 mA Pull up Widerstand Rup 1 k internal Number 1 Logic central stop low act...

Страница 12: ...ircuit proof Logic positive connecting to GND APOS program sample OUT 1 1 means output 1 after GND switched by UB Maximum load current IAN 100 mA Voltage drop 1 8 V for IAN Switching frequency maximum...

Страница 13: ...Operating temperature 0 C 50 C Storage temperature 20 C 70 C Relative humidity 75 without dew Design housing with brackets for easy assembly enclosers for 19 systems option Width 105 mm with brackets...

Страница 14: ...ps towards programming 8 H Hardware Reference 10 I Impressum 2 Incremental Encoder 5 Index Impulse of the Encoder 7 Index Impulse of the Reference Switch 7 Initial operation 4 Inputs Control inputs 12...

Отзывы: