Chapter 4 Product Installation
l
Make sure that the hoisting tools are fixed firmly to a fixture or a wall that can bear the
weight for the hoisting.
l
Use brief commands to prevent misoperation.
Plugging/Unplugging a Module
Here, modules include boards and subracks.
Caution!
l
Operators must wear the antistatic wrist strap.
l
Do not plug a module with great force lest that the pins on the backplane be bent.
l
Plug the module right into the slot and avoid contact between the module and the
circuit face lest that any short circuit occur.
l
Do not touch the module circuits, components, connectors and wiring slots when
holding a module.
l
RF module is very hot during operation,
so you should be careful on
plugging/unplugging.
Personnel
Caution!
Non-professionals should not maintain or debug the interior of any equipment unless
instructed by professionals on site.
Replacing the parts or modifying the equipment may give rise to extra danger. Therefore,
never replace any parts or modify the equipment by any means unless otherwise
authorized.
To ensure your safety, please contact ZTE Corporation if you have any
problem.
4.1.4 Hoisting Operation Instructions
If it is required to hoist eRRU to the tower, refer to the following instructions.
l
Natural conditions for hoisting operation are satisfied, such as no fog and high visibility.
The hoisting operation is prohibited in windy, snowy, or rainy days.
l
Tools for hoisting operation are available, such as the hoisting rope (with a bearing
capacity of 100 kg) and the crown block, and the crown block is firmly installed in
appropriate position on the tower.
l
Open the package to check if the cabinet is in good condition. Hoist the cabinet to the
tower after the inspection.
Perform the following steps for hoisting operation.