ZXMBW E9200 Indoor Pico Base Station User Manual
40
Confidential and Proprietary Information of ZTE CORPORATION
Main Antenna Feeder
System Installation
The ZXMBW E9200 provides external SMA antenna interfaces.
Generally two braid-like antennas are to be installed before
ZXMBW E9200 delivery.
To install an external antenna feeder system, perform the
following steps.
1. Remove the two braid-like antenna from cabinet.
2. Install the external antenna jumper or antenna feeder.
E
ND OF STEP
.
For details, refer to the relevant information of other base
stations.
Hardware Installation Check
This section describes the over all check on the installed cabinet,
cables and running environment.
Cabinet Installation Check
The following describes the checking procedure of installed
cabinet.
Perform the following steps to check the installed cabinet.
1. Check whether the cabinet is installed in the right position
that is complies with the design drawing.
2. Check whether the cabinet is fixedly installed and able to
resist level 7 earthquakes.
3. Confirm the horizontal and vertical deviations of the cabinet
are less than 3 mm (2/16 in).
4. Check whether the overall equipment is clean and painted
well. The parts on the cabinets are intact and well installed.
The labels on the cabinet are correct, clear and complete.
5. Make sure all screws are tightened with flat washers and
spring washers placed correctly.
E
ND OF STEPS
.