Upon completion of unpacking for acceptance, the representative
of user and the project supervisor sign on the Unpacking
Acceptance Report to acknowledge the acceptance. If goods are
to be kept by the user after acceptance, both parties sign on the
Unpacking Acceptance Report for confirmation, and then goods
will be handed over to the user.
Note:
Both parties must hold a copy of Unpacking Acceptance
Report and the project supervisor should give feed back for the
Acceptance Conclusion of this report to ZTE office for archiving
within seven days.
Cabinet Installation
The following introduces ZXMBW E9220 cabinet installation, and
installation modes such as wall-mount installation and pole-
mount installation.
ZXMBW E9200 Cabinet Installation
Introduction
The ZXMBW E9200 cabinet can be installed in two modes
depending on the installation environment.
The installation modes are:
Wall-mount installation
Pole-mount installation
Figure 24 shows the installation supporting parts of ZXMBW
E9200 cabinet.
Handover
Installation
Modes
Cabinet
Installation
Supporting
Parts