ZXG10 OB06 ZTE Integrated Outdoor GSM Base Station Technical Manual
48
Confidential and Proprietary Information of ZTE CORPORATION
9. BS power control procedure: This procedure allows the BSS to control
the transmitting power of an activated channel in the TRX.
10. Connection failure procedure: This procedure allows the OB06 to give
the BSC an indication that an activated dedicated channel has been
disconnected.
11.
Physical environment content request/confirmation procedure: This
procedure allows the BSC to obtain physical parameters of a specific
channel, which generally happens before a change to the channel. This
procedure is optional.
12. SACCH fill-in information change procedure: This procedure allows the
BSC to instruct the OB06 to change the fill-in information (system
message) on a specific SACCH.
Channel Establishment
1. Channel activation
The procedure of activating a channel successfully is shown in Figure
33.
F
I G U R E
3 3
S
U C C E S S O F
C
H A N N E L
A
C T I V A T I O N
MS
LAPDm
FURRM
HPIMan
LAPD
BSC
OAMM
(CHAN ACTIV)
MPH_RRCmdTo
CHP (CHP
CHAN ACTIV)
(CHAN ACTIV
ACK)
DL_DATA_REQ (CHAN ACTIV
ACK)
M PH_CHPIndToRR
(CHP CHAN ACTIV
RESPONSE(ACK)
DL_DATA_IND(CHAN ACTIV)
Dm_PH_CONN_IND
(if chan activated)
MS
Содержание ZXG10 OB06
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 10: ......
Страница 88: ...74 Confidential and Proprietary Information of ZTE CORPORATION ...
Страница 104: ...90 Confidential and Proprietary Information of ZTE CORPORATION This page is intentionally blank ...
Страница 108: ...94 Confidential and Proprietary Information of ZTE CORPORATION This page is intentionally blank ...